Laserfiche WebLink
0 0 <br /> SAFETY MANAGEMENT PROGRAM POLICY/PROCEDURE MANUAL <br /> TITLE: HAZARDOUS MATERIAL SPILL MANAGEMENT POLICY NUMBER 5.06 <br /> PAGE 9 OF 9 <br /> 3.6.4.4 Taking measures to ensure that fires, explosions, and releases <br /> do not occur, recur, or spread to other parts of the facility. <br /> 3.6.4.5 Monitoring for leaks, pressure buildup, gas generator or other <br /> incidents. <br /> 3.6.4.6 Provision for the treatment, storage, or disposal of recovered <br /> waste, waste cleanup materials, contaminated soils/water or any <br /> other material that resulted from the incident. <br /> 3.6.4.7 Ensuring that cleanup efforts are complete and that all <br /> emergency equipment is cleaned and fit for future use or <br /> disposed of. <br /> 3.6.4.8 If necessary, working closely with the External Response Team <br /> Incident Commander, when the position is assigned to someone <br /> else. <br /> Developed by: Safety committee, N. Agualo <br /> Committee Approval: Safety Committee, Leadership Team, Executive Committee <br /> Fresno Revision dates: 09/12/96, 6/25198, 3/30100, S/l/01,Stockton revision date 07/22/02 <br />