Laserfiche WebLink
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If contamination <br />is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) working days <br />pursuant to California Health & Safety Code, Section 25295. <br />TANK I TANK SIZE <br /># (Gallons) <br />-V/ < 1,000 <br />1,000 - 10,00( <br />> 10,000 <br />I PIPING SOIL <br />WATER NOT PRESENT IN THE TANK PIT <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />1 <br />3 or More <br />per Tank <br />PIPING <br />VITANK & PIPING STOCKPILE SAMPLES <br />WATER IS PRESE <br />-------------- <br />TANK TANK SIZE MINIMUM NUMBER <br />(Gallons) of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />OR Pump End <br />1 at each End of Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />1 Sample every 20 lineal feet <br />2 Samples every 50 cubic yards <br />TANK PIT <br />LOCATION of SOIL MINIMUM NUMBER <br />SAMPLES of WATER SAMPLES <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) — <br />TANK I TANK SIZE <br />p (Gallons) <br />111 <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />3 per Tank <br />5 per Tank <br />5 OR More per Tank <br />EH 23 046 (Revised 08/13/99) Page 7 <br />LOCATION of SOIL SAMPLES <br />and Ends OR Sides of <br />and Ends OR Sides of <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />2 from wall next to tank <br />< 10,000 <br />3 ends at soil/groundwater 1 <br />Single Tank <br />g <br />interface & 1 below tank <br />4 from wall next to tank <br />> 10,000 OR <br />ends at soil/groundwater 1 <br />Tank Cluster <br />5 or more interface & 1 below each <br />tank <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) — <br />TANK I TANK SIZE <br />p (Gallons) <br />111 <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />3 per Tank <br />5 per Tank <br />5 OR More per Tank <br />EH 23 046 (Revised 08/13/99) Page 7 <br />LOCATION of SOIL SAMPLES <br />and Ends OR Sides of <br />and Ends OR Sides of <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />