Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 7 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx.45' Approx.50' Approx.30' i <br /> Product Stored: Regular 87 Super 91 Diesel si <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Pi in Sum #1 Piping Sump 92 Piping Sump#3 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> 6 <br /> Test Start Time: 10:40 10:30 10:20 _ <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:40 11:30 11:20 <br /> Final Reading(Rr): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(R,-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />