Laserfiche WebLink
D: Results of Testing/Servicis • <br /> Software Version Installed: �. <br /> Complete the folio checklist: <br /> Yes D No" Is the audible alarm operational? <br /> es E) No* Is the visual alarmoperational? <br /> W Yes D No* Were 0 sensors visually inspected, functionally tested,and conformed operational? <br /> Yes ❑ No* -Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes �/❑, No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> - Fn N/A operational? " <br /> _ Yes ❑ No* For presstuved piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all Aar apply) @1 Stmzp/Trench Sensors; ❑Dispenser 05tahurtmt Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failureldisconnection? 3 Yes; ❑No. <br /> ❑ Yes D No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (Le. no <br /> eNIA mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br /> D Yes* LrNo Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section Z below. <br /> ❑ Yes' 2r No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apple)D <br /> Product; ❑Water. If ves,describe causes in Section E.below. <br /> Yes ❑ No* Was monito ' s tem set-up reviewed to ensure proper settings?Attach set up reports.if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturce s ' cations? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Continents: <br /> Page 2 of 3 03/01 <br />