Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: eCheck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equiprheent is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the followiM checklist: <br /> ❑ Yes 1 ❑ No* Has all input wiring been inspected for proper entry and termination.including testing for ground faults" <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section It below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> i�rYes ❑ No* For equipment start-up or amoral equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Checkall that apply) Simulated leak rate: 26 g.ph; ❑0.1 g.p h; ❑0.2 g.ph <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements) <br /> es ❑ Na* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> eN/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> C'N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> QKN/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> GAN/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section II.below,describe how and when these deficiencies were or will be corrected. <br /> IL Comments: THS Vic5c-z TUR/Sjtj LG D i5 A Z'O� PE7_ /jC <br /> &5k4(ty e4MoJJ6 oS8 Gv6yL7 /M1 SfF3LL l7 <br /> Page 3 of 3 o�ul <br /> 4 ' <br />