Laserfiche WebLink
SWRCB,January 2002 • • Page'—of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ssure ❑vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> �. <br /> Piping Run# Piping Run# Z Piping Run# ,3 Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: Zo 7s-/ <br /> Product Stored: (Z J p ��� D t r5 CL <br /> Method and location of <br /> piping-run isolation: TAT- ,J&)mf 7-1 a-1rJStJMfl TeSrdari of StxtP <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: /D M b4i tst r A) /p Irl / <br /> Test Start Time: ;,CS 5 7xj 9 3S` <br /> Initial Reading(Rr): 405 46 <br /> Test End Time: 10:ts OZD /035 <br /> Final Reading(Rp): SIBS <br /> Test Duration: /�yL <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result amass ❑Fail Pass ❑Fait" bass ❑Fail ❑ Pass 0 Vail <br /> Comments-(include information on repairs made prior to testing, and recommended ollow-vp for failed tests) <br />