Laserfiche WebLink
SWRCB, January 2002 • • Page'—of <br /> 5. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer F<ndustry Standard C Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum ydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> T ... <br /> �� a. . 4 :..x, ,mai-. �. -•sw_ _ .;� <br /> Sump# Sump# Z Sump# '�f Sump# <br /> Sump Diameter: VZ r Z a yZ •e <br /> Sump Depth: SG <br /> v .i <br /> Sump Material: PigF� <br /> Height from Tank Top to Top of / <br /> u <br /> Highest Piping Penetration: Z <br /> Height from Tank Top to Lowest t, <br /> Electrical Penetration: /-J <br /> Condition of sump prior to testing: (j R <br /> Portion of Sump Tested' Zr/ O o 't �,/�loaf Z�+ ✓� <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es D No D NA J7Ves D No DNA lZ�es D No DNA Dyes ONO DNA <br /> roduct and water?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` l�s 0 No D NA Rtes D No D NA yeses 11 No D NA D Yes D No DNA <br /> Was fail-safe verified to be <br /> operational?. C Yes Z-go D NA D Yes H<o DNA D Yes ,aDNA D Yes DNo DNA <br /> Wait time between apply <br /> pressure/vacuum/water and starting <br /> test: CV,/,.j <br /> Test Start Time: 9 qO <br /> Initial Reading W: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 3oM/ oM/ 3oMi <br /> Change in Reading(RF-Rt): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result Pass D Fail 2`fass ❑';Fail �2-fass D Fag 0 Pass D Fail <br /> Was sensor removed for testing? es D No D NA Oes D No DNA B'Ves D No DNA D Yes a No DNA <br /> Was sensor properly replaced and <br /> verified functional after testin •�.ies D No D NA ,H Yes D No D NA ,21es D No D NA C Yes D No D NA <br /> ? <br /> Comments-(mcltrde information on repairs made prior to testing and recommended followarp for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />