Laserfiche WebLink
D. Results of Testing/Servicing <br /> t <br /> Softwarg Version Installed: <br /> Co iete the follo Wg checklist: <br /> es ❑ No* IS the audible alarm emtional? <br /> Y.es ❑ No* Is the visual alarm op erational? <br /> F�rYes ❑ No* Were all sensors visually inspected,functionally tested, and confirmedoperational? <br /> ' Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> i-<A operational? <br /> Yes ❑ No* For pressurized piping-systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operra��or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Q Sump/Treuch Sensors; ❑Dispenser Coplamment Sensors <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? es; ❑ No. <br /> Yes ❑-No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (ie, no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and operating roly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* FaKNo Was any monitoring equipment replaced? If yes,identify specific sensors, probes,or other equipment replaced <br /> and list the manufacaner name and model for all replacement parts in Section E,below. <br /> ❑ Yes' o Was liquid found inside any secondary containment systems designed as dry systems? (Check all than apply)❑ ' <br /> Product;..❑Water- If yes,describe causes in Section E,below. <br /> Y s ❑ No* Was monitorm system set-up reviewed to ensure proper settings?Attach set up reports.if a licable <br /> Yes ❑ No* Is all monirorin a ' mem 2p5Ladonal per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />