My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2001-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:44:39 AM
Creation date
11/2/2018 3:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2012
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2001-2012.PDF
QuestysFileName
COMPLIANCE INFO 2001-2012
QuestysRecordDate
5/14/2018 3:33:43 PM
QuestysRecordID
3891081
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. 1.31-Tank Gauging/SIR Equipment: C3 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co Tete the followin checklist: <br /> ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? i1 <br /> es1WW <br /> ere all tank gauging probes visually inspected for damage and residue buildup? <br /> as accuracy of system product level readings tested? <br /> as accuracy of system water level readings tested? <br /> sere alI probes reinstalled properly? <br /> Yesere all items on the equipment manufacaser's maintenance checklist completed? <br /> *In the Section K below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co the following checklist' <br /> Yes Q No* For equipment start-up or annual equipment c�cation, was a leak simulated to verify LLD performance? <br /> WQ N/A (Check all that apply) Simulated leak rate: 21-3&p.h.; 13 0.1 g p.h; ❑0.2 g.p.h. <br /> Y ❑ No* Were all"LL)s confirmed operational and accurate within regulatory re wremectns? <br /> Cr-);es Q No* Was the testing apparatus properly calibrated? <br /> Yes Q No* For mechanical ILDs,does the LLD restrict product flow if it detects a leak? <br /> ❑,N/A <br /> ❑ Yes ❑ >lb* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> eN/A <br /> ❑ Yes Q * For electronic LLDs,does the turbine automatically shut off if any Penton of the monitoring system is disabled <br /> Lel N/A or disconnected? <br /> Cl Yes ❑ 1o* For electronic LLDs,does the turbine automatically slut off if any portion of the monimdng system malfunctions <br /> [U NIA or fails a test? <br /> Q Yes _❑ For ekxtronic LLDs,have all accessible wiring connections been visually inspected? <br /> 11 N/A <br /> Yes 1 Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H. below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.