My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 3:49:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231036
PE
2361
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1800\PR0231036\INSTALL\INSTALL PLAN 1990.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BJMC/MASTER UTILITY PT•ANT, #8809 5/1/89 <br />Excavation and backfill, concrete pads around, frames and covers, hold-down <br />straps, and anchor and anchor bolts shall be furnished under this section of <br />work and shall be as indicated on Drawings or as hereinbefore specified. <br />�. Provide gauge stick graduated in gallons for tank furnished <br />Test tank with 5 prig air pressure and make tight before backfilling. <br />3. TEST OF FUEL OIL PIPING: <br />Test piping at completion of roughing in, in accordance with SECTION 15060. <br />Testing equipment, materials, and labor shall be furnished by this <br />Contractor. <br />4. CARE AND CLEANING: <br />Repair or replace broken, damaged or otherwise defective parts, materials, <br />and work. Leave entire work in condition satisfactory to Architect. At <br />completion, carefully clean and adjust equipment, fixtures, and trim that are <br />installed as part of this work. Leave systems and equipment in satisfactory <br />operating condition. <br />5. BACKFILL: <br />Prior to backfilling around fuel oil tank, this Contractor shall alert the <br />Owner and allow for tank to be filled by Owner's supplier. <br />END OF SECTION <br />FUEL OIL SYSTEMS <br />15485 — 4 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.