Laserfiche WebLink
BJMC/MASTER UTILITY PT•ANT, #8809 5/1/89 <br />Excavation and backfill, concrete pads around, frames and covers, hold-down <br />straps, and anchor and anchor bolts shall be furnished under this section of <br />work and shall be as indicated on Drawings or as hereinbefore specified. <br />�. Provide gauge stick graduated in gallons for tank furnished <br />Test tank with 5 prig air pressure and make tight before backfilling. <br />3. TEST OF FUEL OIL PIPING: <br />Test piping at completion of roughing in, in accordance with SECTION 15060. <br />Testing equipment, materials, and labor shall be furnished by this <br />Contractor. <br />4. CARE AND CLEANING: <br />Repair or replace broken, damaged or otherwise defective parts, materials, <br />and work. Leave entire work in condition satisfactory to Architect. At <br />completion, carefully clean and adjust equipment, fixtures, and trim that are <br />installed as part of this work. Leave systems and equipment in satisfactory <br />operating condition. <br />5. BACKFILL: <br />Prior to backfilling around fuel oil tank, this Contractor shall alert the <br />Owner and allow for tank to be filled by Owner's supplier. <br />END OF SECTION <br />FUEL OIL SYSTEMS <br />15485 — 4 <br />7 <br />