Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Pagc2or2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49 <br /> vo-sat <br /> ❑ 1,CONTINUOUS ELECTRONIC MONITORING IM2.FLOAT AND THAM ASSEMBLY ❑ 7.6LECIRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): ______ <br /> PANELMANUFACTURER; 490.55 MODELC 490-56. <br /> -....-___._....._-.._.._.___...._..__.—____..—_.--_--___ _ .—___._-.__�__ <br /> LEAK SENSOR MANUFACTURER: Mechanical 490.51 MODEL B(S): 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® e,YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a,YES ❑b.NO 49460. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a.YES ❑b.NO 49062 <br /> E.UDC CONSTRUCTION IS ©I.SINGLE-WALLED ❑ 2.DOUBLE-WALLED 490"0 <br /> IF DOUBLE W4V.LED: as-o-w. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:-❑ 1.LIQUID - 2:1?RESSURE ❑3_VAC_U_UM _ _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE'AND VISUAL ALARMS ❑a YES ❑b.NO 49ad4b <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE S'rATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49oe5 <br /> _ _LEAK DEfT10N(F.LDI MUST BF.PERFORMED. PERIODIC BLD IS PERFORMED EVERY 36 MONTHS AS REQUIRED_j2J CCR$2644 _�__ <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERT'36 MONTHS. 4906 <br /> -�3.SPIU.OUCKElS ARE TESTED ANNUALLY, 490.aa <br /> VIII.RECORDKEEPING <br /> The following 1"Wiloring/mnintenam records are kept for this facility. <br /> N Alarm logs 490-68. ❑Visual Inspection Records 490-6ab ❑Tank integrity testing results 490-sat. <br /> ❑SIR testing resuhs(and supporting dacamismation records). 49oaas ❑ Tank gauging results(and supporting documentation records), 49o.eaa <br /> ❑ATG Testing results(and supporting documentation records).49oarr ❑ Corrosion Protection,60-day logs ego-sea <br /> N Equipment maintenance and calibration records. 49e6ab <br /> _ IX.TRA WING <br /> N Personnel with UST monitoring responsibilities are familiar with all ofihc following documents relevant to their job duties, 49M% <br /> REFERENCE DOCUMENTS MAINTAINED AT]FACILITY(Check all that apply) <br /> N THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4so-6% <br /> N OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)440-W <br /> ❑ CALIFORNIA UNDERGROUND STORAGETANK REGULATIONS 4W-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49069. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"iso-59r <br /> ❑ SWRCE PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49ac9a <br /> OTHER(Specify:mah,a+at <br /> This facility has a"Designated UST Operator"who has passed alit California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will tram facility employees in the proper operation and rumntenance of the UST systems annually,and witbin 30 days of hire.This <br /> training will include,but is not limited to,the follmving: <br /> Opmadem of the UST systems in a mmmor consistent with the facility's best management practices <br /> D The facility employee's mlewidr regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills wad overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.49o-xi <br /> X. COMMENTS/ADDIT-IONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures arc attached in this plan.490n <br /> Flapper Valve <br /> XT.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and J)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Service Contact Center 4m.72 TITLE 2.4 Hours 490-73 <br /> NAME Rudy Tover 494-W TITLE Market Manager 49075 <br /> The Designated Operator shall Worm a monthly visual inspection of the Facility,provide n report to the owner/aperator, and inform the owner/operator of any <br /> conditions that need Niovv up aotipn. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CER 11FICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> AP r' 49016 DATE: 190-12 <br /> 31 Cal t <br /> r " <br /> PLICANT NAIM. (�pri^nt) 490-1° APPLICANTTITLE 490.19 <br /> ZIctN LL,QkIS� Environmental Compliance Manager for <br /> Circle K Stores Inc. <br /> UPCF UST-D(12/2007)2148 <br />