Laserfiche WebLink
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: � �� ADDRESS:'by,7O <br /> FACILITY ID#zs TANK# O U L# TANK MODEL/MATERIAL: <br /> CAPACITY: �� PRODUCT: FAe R.E.H.S: <br /> A 1 <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> If 147 "00 <br /> INITIAL INSPECTIONS <br /> )L A7 !A1 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: 'f,S -&MIN:/Q BRINE(LIOUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRS/MIN: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> PIPING INSPECTIONS <br /> J7. <br /> . PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) S ,5 �O Ikp, (CCR 2636 (e)) <br /> SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> 12-2-9 LAKE TEST ON ALL SIRUPS (24 HRMU. MINIM) HRS: (CCR 2635 (a) (4)) <br /> UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> /a w' PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (e) (2)) <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (e) (2)) <br /> 15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (S)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> 24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> COMMENTS: <br /> EH23-006 7/97 <br /> 10 <br />