Laserfiche WebLink
MATERIAL AND WORKMANSHIP <br />I. UNLE55 OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL <br />EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK <br />COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE <br />GRADE FOR THE PROCESS INTENDED. <br />2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS <br />APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND <br />OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE <br />PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND <br />MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES <br />INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. <br />3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN GALLED FOR BY THE <br />OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR <br />APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES <br />WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN SO <br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE <br />CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. <br />4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED <br />WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT <br />REJECTION. <br />5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND <br />REGULATIONS. <br />6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS <br />AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION <br />OF THE OWNER'S AGENT/ENGINEER. <br />1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR <br />LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THI5 <br />PROJECT, IT 15 EXPECTED THAT THE M05T RESTRICTIVE CONDITIONS) <br />WOULD APPLY. <br />GENERAL CONDITIONS <br />I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING <br />COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE <br />PROVIDED TO THE OWNER'S ENGINEER PRIOR TO THE START OF WORK. <br />2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S <br />TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA UST <br />REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER. <br />CONTRACTOR 51-41L.L COMPLETE THE PIPING INSTALLATION CHECKLIST <br />SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO <br />OWNER. <br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK <br />MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH <br />CALIFORNIA U5T REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO <br />OWNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST <br />SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO <br />OWNER. <br />4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK <br />INSTALLATION PRIOR TO THE START OF WORK. <br />CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'8 <br />EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER <br />5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES; <br />A. GENERAL ENGINEERING <br />B. HAZARDOUS MATERIAL SUBSTANCE HANDLING <br />6. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL <br />HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER <br />AS "ADDITIONAL INSURED". <br />A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY <br />B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE <br />LIMIT OF NOT LESS TNAN s1,000,000 PER OCCURRENCE FOR BODILY <br />INJURY AND PROPERTY DAMAGE. <br />C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED <br />VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY <br />OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND <br />PROPERTY DAMAGE. <br />1. CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND <br />SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE <br />SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR <br />REQUIRED BY THE DRAWINGS, EXCEPT AS NOTED BY OTHERS. <br />S. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM <br />BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, <br />CALIFORNIA UNDERGROILNO STORAGE TANK REGULATIONS, OSHA <br />CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, <br />OR COUNTY ORDINANCES. <br />S. ALL PETROLEUM PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO <br />CONTRACTOR, WHO IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT <br />CONDITIONS. CONTRACTOR SHALL SECURE MISC. ELECTRICAL PERMIT. <br />10. CONTRACTOR SHALL V151T SITE AND FAMILIARIZE HIMSELF OF <br />ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. <br />11. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO <br />REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR <br />REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY <br />EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S <br />OPERATIONS. <br />12. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND <br />STATE REGULATIONS, THE CONTRACTOR IS REFERRED TO THE OSHA <br />BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK <br />PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK <br />13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH <br />"AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "A5 5UILT5" <br />SHALL BE COMPLETED ON-51TE WITH INFORMATION NOTED DIRECTLY ON <br />APPROVED JOB COPY. <br />14. CONTRACTOR SHALL PROVIDE A LIST OF SUB -CONTRACTORS, IF ANY, WHO <br />WILL BE USED ON THE PROJECT. <br />15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND <br />OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES <br />REQUIRED TO RUN THE FACILITY. <br />16. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED <br />TO, THE STANDARDS OF THE FOLLOWING: <br />UNIFORM FIRE CODE (UFC) <br />AMERICAN NATIONAL STANDARDS INSTITUTE (AN50 <br />AMERICAN PETROLEUM INSTITUTE (API) <br />AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) <br />UNIFORM BUILDING CODE (UBC) <br />NATIONAL ELECTRIC CODE (NEC) <br />NATIONAL FIRE PROTECTION AGENCY (NFPA) <br />UNDERWRITER'S LABORATORIES, INC. (UL) <br />CALIFORNIA REGULATIONS <br />LOCAL ORDINANCES <br />11. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE <br />DURATION OF THE CONTRACT A SITE HEALTH J SAFETY PLAN THAT WILL <br />EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, <br />AND: <br />A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO IS QUALIFIED <br />AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE <br />HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF <br />THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK <br />ON THE SITE. <br />B: THE PLAN SHALL CONTAIN THE NAMES, ADDRE56ES AND TELEPHONE <br />NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES <br />NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE <br />WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS <br />OR HAZARDOUS 5U55TANCE5 BE UNCOVERED. <br />C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP <br />OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE <br />CONDITION. IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE <br />OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL <br />CORRECTIVE ACTION CAN BE IMPLEMENTED. <br />D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM <br />CLASS RATING OF 2 -A,20 -5:C WITHIN 50 FEET OF THE OPERATION. <br />18. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY <br />MEMBERS OF U.S.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING <br />ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE -CALL PROGRAM <br />NUMBER (800) 221-2600. <br />PETROLEUM WORK SCOPE <br />L PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND <br />SCHEDULE THAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF <br />THE PROJECT TO THE FULLEST EXTENT POSSIBLE. <br />2. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP <br />OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY <br />SECURE FENCING PANELS TOGETHER <br />3. EXCAVATE A5 NECESSARY FOR THE INSTALLATION OF NEW TANK TRIM 1 PIPING. <br />4, WHEN SOIL IS TO BE STOCKPILED ON BITE FOR SAMPLING PRIOR TO OFF -HAUL, <br />CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 <br />MIL. PLASTIC UNTIL SOIL IS REMOVED, IN AREA TO BE APPROVED <br />BY OWNER / G.C. <br />5. G.C. SHALL PROVIDE FOR DISTRIBUTION OF ALL EXCAVATED SOIL, PER <br />GENERAL PROJECT REQUIREMENTS. <br />6. NOT USED. <br />1. INSTALL TANK TRIM d EQUIPMENT PER DRAWINGS AND CURRENT MNFR'S. <br />INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS <br />SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED. <br />TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'S. REQS. OWNER'S REP. <br />SHALL WITNESS ALL TANK TESTING AT HIS/HER DISCRETION. <br />8. CONTRACTOR TO INSTALL NEW ELECTRICAL SYSTEMS PER PLANS <br />AND MANUFACTURER'S REQUIREMENTS. ARRANGE FOR ALL INSPECTIONS. <br />PROVIDE CONDUITS/WIRING, J -BOXES, ETC. REQUIRED FOR ELECTRICAL <br />SYSTEMS. <br />S. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST AND PROVIDE AND <br />INSTALL. ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE <br />PETROLEUM SYSTEM. <br />10. PROVIDE AND INSTALL. NEW PRODUCT, VENT, VAPOR, AND SECONDARY <br />CONTAINI" TENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS <br />SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED. <br />A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM <br />RED THREAD IIA AND RED THREAD II WITH FITTINGS AND <br />DS -1000 AND DS -8000 SERIES ADHESIVE, OR AMERON DUALOY <br />3000/LCX WITH ALCOHOL FITTINGS AND PSX.34 ADHESIVE. DO NOT MIX <br />DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT <br />SYSTEMS SHALL BE UL APPROVED FOR 100% METHANOL, CONTAINMENT <br />SYSTEM SHALL BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES <br />ADHE51VE5 AND/OR FITTINGS. <br />B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD II WITH <br />FITTINGS AND DS -1000 AND 08-8000 SERIES ADHESIVE, OR AMERON <br />DUALOY 3000/LCX WITH ALCOHOL FITTINGS AND PSX.34 ADHESIVE. <br />DO NOT MIX DIFFERENT MANUFACTURER'S MATERIALS. <br />C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN <br />TRAINED BY MANUFACTURER <br />D; STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE <br />40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS <br />SHALL BE 300 P61 MALLEABLE IRON. <br />E: ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 <br />M!L. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL <br />TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. <br />F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT <br />WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL <br />COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH <br />PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100. METHANOL, WHICH <br />SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br />G; G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL <br />MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. <br />11. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER <br />TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY <br />MNFR. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING <br />IS NOT SHOWN ON SITE PLAN, G.G. SHALL RUN LINES THE MOST DIRECT <br />ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br />12. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. <br />A: G.C. TO NOTIFY OWNER'S REPRESENTATIVE TWO WORKING DAYS PRIOR <br />TO LINE TESTING, OWNER'S REP. SHALL WITNESS ALL LINE TESTING AT HIS/HER <br />DISCRETION. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT <br />BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (1) <br />HOUR AND BE WITNE35ED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL <br />TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. <br />B: TEST PRE55URES SHALL BE: <br />2" - 50 PSI AND APPLY SOAP SOLUTION. <br />3" - 40 PSI AND APPLY SOAP SOLUTION. <br />3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. <br />C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR <br />TO TESTING. APPLY a RELEASE PRESSURE SLOWLY, VENT/VAPOR SYSTEM <br />51-14LL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(S), EXTRACTOR <br />BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR <br />LINES TO ISLANDS AND STAGE II FLEX CONNECTORS AT PISPENSER(W. <br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 <br />1=3I. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS ANP FITTINGS. <br />CORRECT ANY LEAKS AND RETEST. <br />E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE <br />PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE <br />PRE55URE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS <br />Cc;MPLETE. <br />F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY <br />PIPE SURFACES. PRESSURIZE SECONDARY PIPE TO 5 PSI AND 50AP ALL <br />PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY <br />SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING 15 IN PLACE OVER <br />TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OWNER'S <br />REPRESENTATIVE. <br />G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE <br />PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER <br />PAVING IS IN PLACE <br />13. G.C. SHALL PERFORM PREC15ION TEST ON PRODUCT LINES AFTER PAVING <br />IS COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION <br />LINE TEST SHALL BE IN ACCORDANCE WITH NEPA 329, LOCAL <br />REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A <br />CERTIFIED TESTER. G.G. SHALL PROVIDE WRITTEN REPORT OF PRECISION <br />TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF <br />PROJECT. <br />14. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC 5ACKPRE56URE <br />TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. <br />15. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL <br />REGULATIONS. <br />16. CONSTRUCT NEW FUEL ISLANDS AS SHOIUN ON DRAWINGS. <br />11. DISPENSER SUMPS, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE <br />COMPLETELY SEALED AND TESTED, PER CURRENT LOCAL REQUIREMENTS, <br />AND EVIDENGED BY OWNER'S REPRESENTATIVE. MINIMALLY: <br />1. FILL WITH WATER TO HIGHEST PENETRATION. <br />2. SPRAY PAINT TOP OF WATER. <br />18, PROVIDE AND INSTALL CONDUIT i WIRING FOR PETROLEUM 5YSTEM(S) AND <br />LIGHTING AS INDICATED. PROVIDE CONDUIT W/ PULL STRING WHERE FUTURE <br />ELECTRICAL REQUIREMENTS ARE INDICATED ON THE DRAWINGS. <br />IS. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. <br />20, INSTALL NEW TLS 350 MONITORING SYSTEM, AS REQUIRED, PER DRAWINGS <br />AND OWNER'S EQUIPMENT LIST. <br />21. INSTALL DISPENSERS, AND MISC. PETROLEUM SYSTEMS, AS INDICATED ON <br />PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST. <br />22. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS <br />INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE <br />STRENGTH AT 26 DAYS OF 3500 PSI, CONC. DESIGN STRENGTH OVER 2500 PBI <br />15 BY OWNER PREFERENCE, AND DOES NOT REQUIRE SPECIAL INSPECTIONS. <br />23, FULLY TEST ALL SYSTEMS, AND REPAIR AS NECESSARY. <br />PIPING REMOVAL <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION (HAZ.) <br />GUIDELINES AND SOIL AND GROUNDWATER SAMPLING REQUIREMENTS <br />SHALL BE FOLLOWED AT ALL TIMES, EXCEPT WHERE THE FOLLOWING <br />SPECIFICATIONS ARE MORE RESTRICTIVE. <br />OWNER SHALL FILL ALL USTs TO 1051 OF CAPACITY, PRIOR TO START, <br />PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO <br />REMOVAL. PIPING SHALL BE STOCKPILED ON-51TE PRIOR TO DISPOSAL. <br />DUE NOT INDUCE AIR OR WATER INTO THE EXISTING TANKS. <br />VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A 501L <br />SAMPLE SHALL BE TAKEN AND ANALYZED AT THE ENDS AND AT LEAST <br />EACH TWENTY LINEAL FEET OF TRENCH, AND WHERE INSPECTION OF <br />TRENCH OR PIPING REVEAL EVIDENCE OF LEAKAGE. <br />IF INSPECTION REVEALS EVIDENCE OF LEAKAGE, IT SHALL BE <br />DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. <br />SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR <br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. <br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER, <br />CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN - <br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. <br />A. THE ENDS OF THE BRASS TUBE SHALL BE COVERED WITH ALUMINUM <br />FOIL, THEN PLASTIC END CAPS, AND FINALLY WRAPPED WITH A SUITABLE <br />TAPE. <br />B. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, <br />FOR TRANSPORT TO A LABORATORY. FORMAL CHAIN -OF -CUSTODY <br />RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE, <br />C. IF THE BOTTOM OF THE TRENCH IS BELOW THE GROUNDWATER TABLE, <br />SOIL SAMPLES ARE NOT REQUIRED, IN THI5 CASE, A WATER SAMPLE <br />SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF <br />THE GROUNDWATER IN THE EXCAVATION, A CHECK SHALL INITIALLY BE <br />MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 15 <br />DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE <br />DESIGNED TO REDUCE THE L055 OF VOLATILE COMPONENTS. A BAILER <br />IS A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE <br />IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br />WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE <br />USED TO SEAL THIS VIAL. <br />SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL <br />HYDROCARBONS AND OTHER CONTAMINANTS AS DICTATED BY <br />CURRENT CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br />REGULATIONS AND PRACTICES, AND LOCAL REGULATIONS. <br />OWNER SUPPLIED EQUIPMENT <br />CONTRACTORS ARE ADVISED TO CONFIRM OWNER SUPPLIED <br />EQUIPMENT WITH OWNER - SEE LIST AT PET -3. <br />u <br />z <br />-z <br />0 p W z N <br />cp QUQm <br />C I JP <br />zU0U <br />W� <br />L �aQo <br />CJ m LL <br />z9� <br />N'D <br />(Y <br />UL <br />UW <br />iiz <br />W <br />� U <br />JLu <br />X <br />W LL N <br />} <br />Lu N m <br />.Q0 <br />ami <br />O <br />=a <br />aae� <br />U. <br />W <br />@ <br />N <br />1L <br />LL <br />F <br />UUJ <br />H <br />JLu <br />X <br />W LL N <br />} <br />Lu N m <br />.Q0 <br />ami <br />O <br />=a <br />aae� <br />U. <br />W <br />@4 <br />N <br />JLu <br />W <br />F <br />4 <br />'zrU <br />giwf <br />N uV wu <br />w e <br />W z1jE.��w� e <br />ON.Y <br />Z Cw,�i Lww� <br />'arc°� _ <br />UW <br />LI V a q�znL <br />a <br />IS) W N w °off <br />q�gou p <br />(ilaGW�oU <br />www ou <br />PET=5 <br />OF SHEETS <br />