Laserfiche WebLink
(3) hours prior to Contractors arrival. Owner-Operator must provide an additional twenty (20) <br /> gallons in a separate container for standpipe fill or makeup purposes. If any line including but <br /> not limited to, abandoned lines, or permanent fill tube extensions must be capped or modified <br /> in any way , or if any buried manhole or any other vapor trap must be vented, such action <br /> shall be the sole responsibility of the Owner-Operator. It shall be the sole responsibility of the <br /> Owner-Operator to verify that the information as shown in paragraph two (2) is accurate and <br /> correct, and to advise the Contractor if the existing ground water level is above the bottom of <br /> the storage tank. <br /> 8. If the Owner-Operator does not, for any reason, have the tank(s) ready for testing upon the <br /> arrival of Contractor's testing crew, Owner-Operator shall pay Contractor for any waiting <br /> and/or lost time at the rate of $42.50 per manhour. If a not tight system condition is <br /> determined and the Owner-Operator desires to have Contractor further investigate the <br /> source(s) and/or effect repairs; Contractor shall conduct such extra work at the rate of $42.50 <br /> per manhour plus the cost of repair materials as needed. Separate supply line tests, well <br /> point installations and/or retests are considered extra work. <br /> CONTRACTOR OWNER/OPERATOR <br /> Integrity Tank Testing Service, Roto Rooter Sewer Service <br /> Div. of Oil Equipment Service Attention: Mr. John Sae6ge <br /> Post Office Box 950 3480 Carpenter Road <br /> San Andreas, Ca. 95249 Stockton, California 95205 <br /> (209) 754-1808 or (800) 262-8378 (209) 465-2616 <br /> as gaaage <br /> W. N. Savage By <br /> Manager <br /> Title <br /> January 13, 1994 Date <br />