My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
3480
>
2300 - Underground Storage Tank Program
>
PR0231533
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:27 AM
Creation date
11/2/2018 4:13:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231533
PE
2381
FACILITY_ID
FA0003745
FACILITY_NAME
ROTO ROOTER
STREET_NUMBER
3480
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17916040
CURRENT_STATUS
02
SITE_LOCATION
3480 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\3480\PR0231533\COMPLIANCE INFO 1989 - 2011.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 2011
QuestysRecordDate
8/2/2017 11:41:49 PM
QuestysRecordID
133593
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> STANDARD TESTING AGREEMENT <br /> 1 . It is expressly recognized and agreed that the sole responsibility of Contractor is to test, <br /> using a State of California approved test method, and to certify that the storage tank, as <br /> described in paragraph two (2), at the time of testing, either meets or does not meet the <br /> tolerances for a tight tank as established by regulatory standards; and to deliver to Owner- <br /> Operator a written report with respect to the results of Contractor's tests. <br /> 2. Contractor shall test the tank(s) with the following description(s): <br /> Tanks located at: 3480 East Carpenter Roan, Stockton, Ca. <br /> Testing to start at: 8:00 AM on Friday, January 28, 1994 <br /> TANK CAPACITY PRODUCT CONTAINED TANK #/LOCATION <br /> i <br /> 10,000 Gasoline Southeast <br /> 1,000 Diesel Fuel Northwest <br /> 3. For the testing of the above described tanks, Contractor shall be paid the following fee, per <br /> tank, per test: Twohund red ninety ($290.00) Dollars. <br /> 4. All fees will be invoiced by the Contractor upon completion of the test. All amounts are due <br /> and payable on a net cash basis. Owner-Operator agrees to pay reasonable attorneys' fees <br /> as fixed by the court, and interest charges, at the rate-of 1.5% per month, in the event legal <br /> actions is necessary to collect any balance due. <br /> 5. Contractor shall have no responsibility whatever for the repair of any leaks which may be <br /> detected or in any way in connection with or with respect to any contaminant or hazardous <br /> waste which may exist before Contractor's testing, during Contractor's testing, or at any time <br /> after Contractor's testing. The sole responsibility for any reports to governmental agencies or <br /> authorities and for the removal and disposal of any such contaminant or hazardous wastes, <br /> and any corrective or remedial action in any way in respect thereto, shall be that of the <br /> Owner-Operator, alone. Contractor shall have no responsibility whatever in any way in <br /> connection with any attempted corrective remedial action by Owner-Operator or its' <br /> contractors, subcontractors, or any other third party. The provisions of this paragraph shall be <br /> included in any contract entered into by Owner-Operator in connection with the subject matter <br /> of this Agreement. <br /> 6. Owner-Operator and their contractors, subcontractors, and any other third party involved, <br /> and each and all of them, agree to hold Contractor free and harmless from any and all <br /> liability, loss, cost, expense, or damage, including consequential damages in any way arising <br /> in any way connected with the Agreement or any attempted corrective or remedial action <br /> undertaken by Owner-Operator or their contractors, subcontractors, or any other third party, <br /> except only for the liability which may arise from Contractor's sole negligence or willful <br /> misconduct. <br /> 7. Any tank to be tested by Contractor must be filled by Owner-Operator to capacity plus four <br /> (4) inches into the respective fillpiping, and allowed to remain static for a minimum of three <br />
The URL can be used to link to this page
Your browser does not support the video tag.