My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:40:42 PM
Creation date
11/2/2018 4:19:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/2/2012 8:00:00 AM
QuestysRecordID
119110
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) follow all operating procedures specified by Franchisor, <br /> ( f) immediately report to Franchisor all suspected or confirmed releases from the tanks <br /> and connected piping system, unusual operating conditions, release detvction signals and <br /> environmental conditions suggesting a release may have occurred, and any spills and overfills that <br /> are not contained and cleaned up: <br /> (g) property dose the underground tanks as required by law: and. <br /> (h ) comply with all federal, state and local legal requirements relevant to the operations <br /> of the underground tanks and all amendments to any permit to operate. <br /> a. With respect to the operation of the underground storage tank system and monitoring <br /> equipment. Franchisee hereby acknowledges and agrees: <br /> that ARCO has provided Franchisee with training on each of the hems described in <br /> the attached Monitoring and Response Plan, <br /> that Franchisee understood the content of the training, and asked any questions <br /> necessary to facilitate his understanding, <br /> that Franchisee indicated to ARCO at the time of training any subjects addressed by <br /> the training which Franchisee did riot fully understand, and <br /> that Franchisee received complete training and information necessary for <br /> Franchisee to fully understand the subject of operating.underground storage tanks. <br /> 5. Franchisor has provided Franchisee a copy of and Franchisee agrees to maintain on the <br /> Premises the Certificate of Financial Responsibility (as required by the United States <br /> Environmental Protection Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety <br /> Code, Chapter 6.7, Section 252922). <br /> 6. Except to the extent they conflict with, or are less rigorous than the terms of this <br /> Amendment, all of the terms and conditions of the PMPA Agreement, as previously or hereafter <br /> amended or supplemented, remain in full force. <br /> IN WITNESS WHEREOF, Franchisor and Franchisee have executed this Amendment <br /> WITNESS: ARCO Products Company <br /> a division of Adan icRichfieldComparry <br /> Franchisor <br /> By: <br /> f�rAueh4='� <br /> WITNESS: -/Ci��� �j ���r.-• <br /> FRANCFSEES NAME <br /> By: <br /> M 4 NAre,e <br /> DATE: <br /> 11191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.