Laserfiche WebLink
L <br />I FUEL DISPENSER TTP. <br />-- VENT RISERS, <br />SEE SITE PLAN FOR ACTUALACiJ. _ <br />INSTALL MAXIMUM SLOPE FROMM TANK K <br />UP TO VENT R15ER (MIN <br />ELOPE/4"/RE <br />COPE VAPOR RETURN LINE <br />OW <br />I/4 <br />PER FT. MIN. DTO - - 1"0 PRODUCT IN <br />LAR UNLEADED TANK --� �/\ , 3'Y BEG. CON. PIPE <br />-NOTE: <br />FIBERGLASS SUMP �1 <br />SHOWN IN 5ECTION <br />FOR CLARITY, if <br />C014TAINMEN7 BUMc�� <br />(TTP. 7) <br />2"0 VENT <br />+►, ` <br />3ov.R <br />I i rf <br />3"x3'x2' FRP. TEE - <br />SUP \ <br />UNL�: �pED <br />cam <br />III I �^ __.. 4"R <br />vR <br />SLOPE PRODUCT LINES <br />1/4" PER FOOT MINIMUM <br />FROM DISPENSERS TO TANK (TYP.) <br />SEE BITE PLAN FOR <br />EXACT INSTALLATION LOCATION <br />OF STORAGE TANKS. <br />UNDERGROUND TANK AND P'IP'ING ISOMETRIC, SCHEMATIC <br />5GALE: NONE <br />U <br />2"0 PRODUCT IN <br />3"0 SEC. CON. PIPE <br />2"0 PRODUCT IN <br />3"0 BEC. CON. PIPE <br />3"0 V.R. <br />TO 2"0 <br />U (I& OK, <br />vie <br />VAPOR <br />8 U <br />U <br />I11 <br />I_ <br />S <br />m <br />ltT <br />n <br />I <br />yR <br />r/ <br />I <br />REDUCE VAPOR TO <br />3 <br />p <br />1"0 LIME <br />(TYR) <br />U \ <br />RN PRODUCT PIP141 <br />& <br />AND ELECTRICAL <br />yfit�(� <br />r- <br />CONDUIT INTO <br />_ <br />OPPOSITE <br />_ 2'v PRODUCT IN <br />DISPENNSERSY <br />DT <br />3"0 SEC. CON. PIPE <br />(BEE PIPNG PLAN) <br />3"o VR — <br />.-2"0 PRODUCT IN <br />REDUCE VAPOR TO <br />3110 SEC. CON. PIPE <br />2'Y LINE --- <br />�..� <br />(T7P.) <br />U <br />PN VALVE <br />vR � <br />-- VENT RISERS, <br />SEE SITE PLAN FOR ACTUALACiJ. _ <br />INSTALL MAXIMUM SLOPE FROMM TANK K <br />UP TO VENT R15ER (MIN <br />ELOPE/4"/RE <br />COPE VAPOR RETURN LINE <br />OW <br />I/4 <br />PER FT. MIN. DTO - - 1"0 PRODUCT IN <br />LAR UNLEADED TANK --� �/\ , 3'Y BEG. CON. PIPE <br />-NOTE: <br />FIBERGLASS SUMP �1 <br />SHOWN IN 5ECTION <br />FOR CLARITY, if <br />C014TAINMEN7 BUMc�� <br />(TTP. 7) <br />2"0 VENT <br />+►, ` <br />3ov.R <br />I i rf <br />3"x3'x2' FRP. TEE - <br />SUP \ <br />UNL�: �pED <br />cam <br />III I �^ __.. 4"R <br />vR <br />SLOPE PRODUCT LINES <br />1/4" PER FOOT MINIMUM <br />FROM DISPENSERS TO TANK (TYP.) <br />SEE BITE PLAN FOR <br />EXACT INSTALLATION LOCATION <br />OF STORAGE TANKS. <br />UNDERGROUND TANK AND P'IP'ING ISOMETRIC, SCHEMATIC <br />5GALE: NONE <br />U <br />2"0 PRODUCT IN <br />3"0 SEC. CON. PIPE <br />2"0 PRODUCT IN <br />3"0 BEC. CON. PIPE <br />3"0 V.R. <br />TO 2"0 <br />U (I& OK, <br />vie <br />VAPOR <br />8 U <br />SPECIFICATIONS <br />UNDERGROUND TANKS, RESPONSIBILITY <br />I. The Contractor accepts full responsiblh¢ for proper handling and Installation of tINs rlberglass <br />reinforced plastic (FRP) or Composite undergrowol tanks and FRP piping, and shall ensure that <br />good workmanship, practices and construction procedures are followed during the handling and <br />Installation or the tanks and piping <br />2. The Contractor is responsible for inepacting Un tanks for damage upon receipt at the Job site. <br />Any visible damage Is to be noted on the deilvery receipt. <br />3. The presence or the Ownen's Rep. on Bite does not relieve the Contractor of the ruponslbllity <br />for proper tank handling, inetallatton and so rety meawas. <br />NOTES <br />I. SCHEMATIC LAYOUT SHOWN FOR MULTIPRODUCT DISPEN6ER5. SEE PLANS FOR <br />SPECIFIC DISPENSER TYPE AND CONFIGURATICN FOR THIS SITE. <br />2. ALL PRODUCT LINES ARE TO BE SECONDARILY CONTAINED. <br />3. EVERY TANK CONTAINMENT BUMP AND DISPENSER CONTAINMENT BUMP SHALL CONTAIN <br />A LIQUID SENSING PROBE. <br />4. CAULK THE BOTTOM OF THE DISPENSERS TO INSURE WATER TIGHTNESS. <br />5. PERPENDICULAR PENETRATIONS OF THE CONTAINMENT 5UMP6 ARE PREFERRED. <br />20' 18 THE MAXIMUM ALLOWABLE PENETRATION ANGLE. <br />6. SPARE ELECTRICAL CONDUITS MUST BE SEALED. <br />T. OBTAIN WRITTEN APPROVAL FROM COUNTY ENVR HEALTH FOR LES& THAN 1/4' PER FOOT <br />SLOPE ON PRODUCT, VAPOR AND VENT LINES. <br />S. TANK RISERS AND DISPENSER PIPING MUST BE ADDRESSED AS FOLLOWS FOR TAMC& <br />CONTAINING GASOLINE <br />• ANNULAR SPACE RISER MUST BE SCHEDULE 40 GALVANIZED PIPE THAT 16 PRIMED <br />AND WRAPPED. <br />• FILL, VAPOR AND AUTOMATIC TANK RISER MUST BE SCHEDULE 40 GALVANIZED PIPE. <br />.EACH RISER MUST BE PRIMED AND WRAPPED IF BACKFILL 18 TOUCHING THE RISER <br />• TURBINE RISER MUST BE SCHEDULE 40 BLACK IRON PIPE. <br />• ALL STEEL DISPENSER PIPING .AND FITTINGS MUST BE SCHEDULE 40 BLACK IRON PIPE <br />AND PAINTED BLACK <br />S. USE 3"0 VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED T<rNIC <br />10. SUPREME SIDE OF DISPENSERS MUST ALWAYS BE ON THE LEFT. <br />11�3 <br />11) 111 <br />I•• > o p. O <br />WUtzIt <br />BOO!-mtplil0 <br />uj <br />� <br />Ix ort r <br />�Q eQ 1 Qu <br />� N QT q <br />m3 `0Q <br />Q) L <br />EL <br />U <br />_I <br />I11 <br />I_ <br />111 <br />m <br />ltT <br />n <br />I <br />I -- <br />q <br />ItlLu <br />r/ <br />I <br />SPECIFICATIONS <br />UNDERGROUND TANKS, RESPONSIBILITY <br />I. The Contractor accepts full responsiblh¢ for proper handling and Installation of tINs rlberglass <br />reinforced plastic (FRP) or Composite undergrowol tanks and FRP piping, and shall ensure that <br />good workmanship, practices and construction procedures are followed during the handling and <br />Installation or the tanks and piping <br />2. The Contractor is responsible for inepacting Un tanks for damage upon receipt at the Job site. <br />Any visible damage Is to be noted on the deilvery receipt. <br />3. The presence or the Ownen's Rep. on Bite does not relieve the Contractor of the ruponslbllity <br />for proper tank handling, inetallatton and so rety meawas. <br />NOTES <br />I. SCHEMATIC LAYOUT SHOWN FOR MULTIPRODUCT DISPEN6ER5. SEE PLANS FOR <br />SPECIFIC DISPENSER TYPE AND CONFIGURATICN FOR THIS SITE. <br />2. ALL PRODUCT LINES ARE TO BE SECONDARILY CONTAINED. <br />3. EVERY TANK CONTAINMENT BUMP AND DISPENSER CONTAINMENT BUMP SHALL CONTAIN <br />A LIQUID SENSING PROBE. <br />4. CAULK THE BOTTOM OF THE DISPENSERS TO INSURE WATER TIGHTNESS. <br />5. PERPENDICULAR PENETRATIONS OF THE CONTAINMENT 5UMP6 ARE PREFERRED. <br />20' 18 THE MAXIMUM ALLOWABLE PENETRATION ANGLE. <br />6. SPARE ELECTRICAL CONDUITS MUST BE SEALED. <br />T. OBTAIN WRITTEN APPROVAL FROM COUNTY ENVR HEALTH FOR LES& THAN 1/4' PER FOOT <br />SLOPE ON PRODUCT, VAPOR AND VENT LINES. <br />S. TANK RISERS AND DISPENSER PIPING MUST BE ADDRESSED AS FOLLOWS FOR TAMC& <br />CONTAINING GASOLINE <br />• ANNULAR SPACE RISER MUST BE SCHEDULE 40 GALVANIZED PIPE THAT 16 PRIMED <br />AND WRAPPED. <br />• FILL, VAPOR AND AUTOMATIC TANK RISER MUST BE SCHEDULE 40 GALVANIZED PIPE. <br />.EACH RISER MUST BE PRIMED AND WRAPPED IF BACKFILL 18 TOUCHING THE RISER <br />• TURBINE RISER MUST BE SCHEDULE 40 BLACK IRON PIPE. <br />• ALL STEEL DISPENSER PIPING .AND FITTINGS MUST BE SCHEDULE 40 BLACK IRON PIPE <br />AND PAINTED BLACK <br />S. USE 3"0 VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED T<rNIC <br />10. SUPREME SIDE OF DISPENSERS MUST ALWAYS BE ON THE LEFT. <br />11�3 <br />11) 111 <br />I•• > o p. O <br />WUtzIt <br />BOO!-mtplil0 <br />uj <br />� <br />Ix ort r <br />�Q eQ 1 Qu <br />� N QT q <br />m3 `0Q <br />Q) L <br />EL <br />U <br />_I <br />� Ul <br />OQ uo'' <br />loo <br />VW oQz <br />Of' fYp <br />F <br />U) [��>Oz <br />�INN� <br />ui It <br />I11 <br />I_ <br />111 <br />m <br />ltT <br />n <br />V <br />I -- <br />q <br />ItlLu <br />3 <br />p <br />� Ul <br />OQ uo'' <br />loo <br />VW oQz <br />Of' fYp <br />F <br />U) [��>Oz <br />�INN� <br />ui It <br />PET -2 <br />OF 8 SHEETS <br />I11 <br />I_ <br />I -- <br />q <br />ItlLu <br />Q <br />PET -2 <br />OF 8 SHEETS <br />