Laserfiche WebLink
m <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VL PIPING CONSTRUCTION fceek.0 thrt 1 P'a EL' <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®I.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458 ❑1.PRESSURE ❑2. SUCTION ❑3.GRAVITY 459 <br /> e0N5TRUCnoN ❑1.SINGLE WALL [33.LINED TRENCH [399.OTHER 460 ❑1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER M 2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER Smith Fiber IRss 461 MANUFACTURER 463 <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE w/10n% METHANOL 1]1.BARE STEEL ❑6.FRP COMPATIBLE W/IW%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑Unknown ❑2. STAINLESS STEEL [17.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99. OOta [13. PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99. OTHER <br /> ®4.FIBERGLASS ❑S.FLEXIBLE(HDPE) ❑4. FIBERGLASS [19.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING [19.CATHODIC PROTECTION 461 ❑5. STEEL W/COATING [195.UNKNOWN 465 <br /> VII.PIPING LEAK DETECTIONChak ell that Adeacdtion of the rncaimting progaun stalle eubmitted to the Mal em. <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING((Meck all tet apply): <br /> ❑1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST AUTO PUMP SHUT [11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST T AUTO PUMP <br /> OFF FOR LEAK SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> [13.ANNUAL INTEGRITY TEST(0.1GPH) ❑3.ANNUAL INTEGRITY TEST(0.1GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑ <br /> S.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17.SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW 07. SELF MONITORING <br /> [19.BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Chack all that apply): <br /> ❑8. DAILY VISUAL MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Ch Jt eat that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WIT AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WIT AUDIBLE AND VISUAL <br /> ALARMS AND(Check oppe) ALARMS AND(beck own <br /> ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> 19 b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> (3c: NO AUTO PUMP SHUT OFF (]c NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WIT FLOW SHUT 17 11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ®12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPI) <br /> SUCTION/GRAVITY SYSTEM SUCrION/GRAVITY SYSTEM <br /> 013. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all Out apply) EMERGENCY GENERATORS ONLY(Oeck all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITH AUTO PUMP SHUT OFF' <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> [115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW 0 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> [116.ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [117. DAILY VISUAL CHECK ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT [11.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 46d ❑2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> 2003 ®3.CONTINUOUS DISPENSER PAN SENSOR WIT AUTO SHUT OFF FOR [16.NONE 469 <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I aeuify that the inforwnian provided hertin is nue and were a to the bat ofmy knowledge. <br /> SIGNA OF OWNER/OP RATOR DATi 470 <br /> NAM OWNER/OPRATOR(print) <br /> 471 1 TITI OF WNER/OPERATOR 4T <br /> AtA IM YAAL� i T <br /> Pmnit Numlxr(For tical we only) 473 Pened Approved(Por local we only) 474 Permit Expiration Dote(For Ioeal use only) 475 <br /> UPCF(12/99 revised) 12 Formerly SWRCB Form B <br />