My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors Page 1 of 2 <br /> 6. PIPING.SUMP TESTING. <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Sped) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> F -- <br /> Sump #2 Diesel Sump Sump Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 65" Lj <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 24" SEP y <br /> Highest Piping Penetration: <br /> Leight from Tank Top to Lowest „ <br /> Electrical Penetration: 17 ENV; MENTAL HEALTH <br /> Condition of sump prior to testing: Clean <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe X Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?` <br /> Was fail-safe verified to be X Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 10:00 <br /> Initial Reading(R,): 25" <br /> Test End Time: 10:36 <br /> Final Reading(RF): 25" <br /> Test Duration: 30min <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: Pass <br /> Test esult: X Pass D Fall Pass El Fail D Pass El Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and X Yes No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.