Laserfiche WebLink
Elite IV Contractors Paget of 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> "TestEquipent Used: Equipment Resolution: <br /> Piping Run# Piping Run# Pipiug Run# Piping Run# <br /> rial: <br /> facturer. <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuurn/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(Rv): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail 1-0 Pass ❑Fail ❑ Pass ❑Fall <br /> Comments—(include information on repairs made prior to testing,and recommended follow-upLorfailed tests) <br /> 9) <br /> i <br />