Laserfiche WebLink
Page 1 of 2 <br /> Elite IV Contractors <br /> 6. PIPING StJAIP TESTING <br /> Test Method Developed$y: <br /> Sump Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Vacuum X Hydrostatic <br /> Test Method Used: Pressure <br /> Equipmettt Resolu <br /> Test Equipment Used:Caldwell Other(Specify) tion: <br /> Sump <br /> Sump Sump Sump <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hiest Pi in Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested <br /> Does turbine shut down when yes No NA Yes No NA Yes No NA <br /> SUMP sensor detects liquid(both Yes No NA <br /> product and water}? <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown? Yes No NA <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA <br /> o rational? <br /> Wait time between applying <br /> pressurelvacuumlwater and starting t <br /> test: <br /> Test Start Time: HP P 01 C <br /> Initial Reading 00: <br /> Test End Time: <br /> Final Reading(RF): <br /> r- <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: D Pass 0 Fait <br /> Test Result: Pats ❑Fail Pass ❑Pall 0 Pass p Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced No NA Yes Na NA Yes No NA <br /> and Yes No NA Yes <br /> verified functional a$er testin <br /> COMMents— (include information on re airs made prior to testing, and recommended ollow-uPlfor failed tests) <br /> 4 If the entire depthof the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"No"or"NA7,the entire sump must be tested. (See SWRCB LG-150) <br />