My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:29 PM
Creation date
11/2/2018 4:33:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\1033\PR0232352\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
8/8/2018 11:06:32 PM
QuestysRecordID
3201703
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Elite IV Contractors <br /> 6. PIPING StJAIP TESTING <br /> Test Method Developed$y: <br /> Sump Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Vacuum X Hydrostatic <br /> Test Method Used: Pressure <br /> Equipmettt Resolu <br /> Test Equipment Used:Caldwell Other(Specify) tion: <br /> Sump <br /> Sump Sump Sump <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hiest Pi in Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested <br /> Does turbine shut down when yes No NA Yes No NA Yes No NA <br /> SUMP sensor detects liquid(both Yes No NA <br /> product and water}? <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown? Yes No NA <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA <br /> o rational? <br /> Wait time between applying <br /> pressurelvacuumlwater and starting t <br /> test: <br /> Test Start Time: HP P 01 C <br /> Initial Reading 00: <br /> Test End Time: <br /> Final Reading(RF): <br /> r- <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: D Pass 0 Fait <br /> Test Result: Pats ❑Fail Pass ❑Pall 0 Pass p Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced No NA Yes Na NA Yes No NA <br /> and Yes No NA Yes <br /> verified functional a$er testin <br /> COMMents— (include information on re airs made prior to testing, and recommended ollow-uPlfor failed tests) <br /> 4 If the entire depthof the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"No"or"NA7,the entire sump must be tested. (See SWRCB LG-150) <br />
The URL can be used to link to this page
Your browser does not support the video tag.