Laserfiche WebLink
I <br /> SAMPLIN -PROTOCOL FOR ROUTINE TANK REN 6VALS <br /> i <br /> I <br /> 'Ilse following represents m inhumn sampling criterion required for closure compliance. Soil samples collected shall be <br /> representalive of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> conlaminatlon is documented during closure, an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRPSENT IN 771E TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> A (Onllons) <br /> or SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> I'm() - 10,11(10 2 per Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> �( PIPINO SOIL SAMPLES I Sample every 20 lineal feet <br /> �h-- TANK & PIP INO STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WA'T'ER IS PRESENT IN TANK PIT <br /> TANK 'TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> (Gnllons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> Interface <br /> > 100V OR From wall next to lank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> I. <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall he obtained beneath the slab within native soils. Penetration through the obstruction will be required In <br /> order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES„ <br /> A' (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> l,(XX) • 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> i <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> Eft 23 047 (Revised 7/10/92) Page 7 <br />