My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
710
>
2300 - Underground Storage Tank Program
>
PR0540518
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:47 AM
Creation date
11/2/2018 4:50:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0540518
PE
2381
FACILITY_ID
FA0002547
FACILITY_NAME
QUEEN OF SHEBA #2
STREET_NUMBER
710
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16717002
CURRENT_STATUS
02
SITE_LOCATION
710 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\710\PR0540518\REMOVAL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELIC <br /> ENGINEERING <br /> CORPORATION <br /> 287 N. Cardinal Avenue • P. O. Box 2076 • Stockton, California 95201 <br /> TANK DECONTAMINATION PROCEDURES <br /> I <br /> Telic Engineering Corproation will remove all residue in tank by <br /> high pressure wash and steam. The tank will be steamed at 2000 - <br /> 300° for approximately 45 minu s and then high pressure washed. <br /> All residue will be removed fr In tank by means of a vacuum truck <br /> and transpo4ed to a state ce itified TSDF on a hazardous waste <br /> manifest . The above tank de ontamination will be performed by <br /> Telic Engineering Corporation nd rinstate will be transported by <br /> a licensed hazardous waste uler. Once tank is empty of all <br /> residue, the tank will be purged by means of inserting 20 pounds <br /> l j of dry ice per 1, 000 gallons compacity of tank. Piping will be <br /> disconnected at dispenser and decontaminted by means of pressure <br /> wash and steam. <br /> I <br /> � ' i <br />
The URL can be used to link to this page
Your browser does not support the video tag.