My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
710
>
2300 - Underground Storage Tank Program
>
PR0540518
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:47 AM
Creation date
11/2/2018 4:50:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0540518
PE
2381
FACILITY_ID
FA0002547
FACILITY_NAME
QUEEN OF SHEBA #2
STREET_NUMBER
710
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16717002
CURRENT_STATUS
02
SITE_LOCATION
710 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\710\PR0540518\REMOVAL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELIC ENGINEERING CORPORATION (TEC) STANDARD OPERATING <br /> PROCEDURE (SOP) / 88-005 <br /> GENERAL GUIDELINES FOR UNDERGROUND TANK REMOVAL <br /> -UNDERGROUND STn <br /> RA('F TANK REMOYALS <br /> The following procedures should be used prior to the removal <br /> of any underground tank that previously stored a flammable <br /> or combustible liquid. to addition, the procedures outlined <br /> below must be followed to ensure that the entire preparation <br /> and removal operation is conducted in a safe manner and the <br /> possibility of an explosive incident is minimized. <br /> A. Pyo° Review�tehsdnle_F Removal <br /> The following sequence is required to ensure prompt <br /> and successful removal inspections: <br /> ' Upon receipt of the ARgLgy Ji plans from <br /> Environmental Health, forward one act to <br /> Local Fire Department, and one set to the <br /> local building department. <br /> At least 2 working days prior to the removal <br /> of underground storage tank(&), contact the <br /> local Fire Prevention Field Department and <br /> Health Department. <br /> B. Removal/On cit Pro d <br /> Telic Engineering Corporation shall ensure that AU <br /> flammable liquids/materials have been removed <br /> from the tank(&) by means of an approved vacuum <br /> truck prior to excavation. <br /> Under no circumstances shall welding equipment, <br /> torches or any device capable of actiig as an <br /> 18 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.