My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
450
>
2300 - Underground Storage Tank Program
>
PR0231323
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:52:24 PM
Creation date
11/2/2018 5:09:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231323
PE
2381
FACILITY_ID
FA0003792
FACILITY_NAME
U-Haul Moving & Storage of Lodi
STREET_NUMBER
450
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
041-300-12
CURRENT_STATUS
02
SITE_LOCATION
450 N Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\450\PR0231323\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U-Haul <br /> Facility Number 709-83,450 North Cherokee Lane <br /> Lodi, California <br /> WPI Project#96237 <br /> HEALTH AND SAFETY PLAN <br /> Page 2 <br /> SITE SPECIFIC HEALTH AND SAFETY PLAN <br /> UNDERGROUND STORAGE TANK REMOVAL ACTIVITIES <br /> U-HAUIJAMERCO REAL ESTATE <br /> Facility Number 709-83, 450 North Cherokee <br /> Lodi, California <br /> SECTION 1.0 <br /> 1.1 INTRODUCTION <br /> This Health and Safety Plan, prepared by Wayne Perry, Inc. (WPI) describes the basic safety <br /> requirements for performing underground storage tank (UST) removals and soil and water <br /> sampling at the U-Haul/Amerco Real Estate (U-Haul) facility number 709-83 located at 450 <br /> North Cherokee Lane in Lodi, California. <br /> The scope of work for this project includes the removal and disposal of one 10,000-gallon <br /> gasoline and one 10,000-gallon diesel tanks. The gasoline tank has contained both leaded and <br /> unleaded gasoline. Both the diesel and gasoline tanks are of single wall steel construction. Tank <br /> appurtenances include dispensers, piping, electrical controls, and vent piping. Site operations <br /> will include sawcutting, removal of electrical connections and system appurtenances, concrete <br /> removal, excavation, tank rinsing, soil sampling, tank removal, backfilling, resurfacing, tank and <br /> soil disposal. <br /> The facility is surrounded by a chain link fence that is locked during non-business hours to <br /> prohibit public access. A site location map is included as Figure 1. The site layout, showing the <br /> locations of the UST's, associated structures, work zones, and evacuation routes are shown on <br /> Figure 2. <br /> The provisions herein will apply to the employees of WPI, U-Haul and any subcontractor <br /> working at a subject site. The subcontractors may elect to modify these provisions, but only to <br /> upgrade or increase the safety requirements, and only then with written approval from WPI's <br /> Senior Safety Officer. <br /> This Health and Safety Plan addresses the potential hazards that may arise from performing the <br /> work and from interactions with U-Haul employees at this site and the emergency response <br />
The URL can be used to link to this page
Your browser does not support the video tag.