Laserfiche WebLink
U-Haul <br /> Facility Number 709-83,450 North Cherokee Lane <br /> Lodi, California <br /> WPI Project#96237 <br /> HEALTH AND SAFETY PLAN <br /> Page 9 <br /> • At the end of each workday, all stockpiles shall be covered with 2 layers of overlapped, <br /> continuous, heavy plastic sheeting and secured to withstand high winds. <br /> 4.4 SAFETY TRAINING <br /> A. All WPI employees employed in environmental assessment and remediation activities <br /> will have completed 40-hour health and safety training for hazardous site workers, and <br /> required refresher courses, as mandated by Federal OSHA 29 CFR 1910 requirements. <br /> B. Site workers will be required to attend site-specific briefings relating to the operations <br /> and materials to be encountered during the project. These briefings will be conducted by <br /> the Site Safety Officer and may include practical instruction regarding the hazards to be <br /> expected, and protective and preventive measures to be utilized. <br /> C. Employees will be required to have instruction in the use of fire extinguishers and fie <br /> prevention procedures. Included in this training will be: <br /> 1. Names of employees and alternates responsible for safety and health; <br /> 2. Acute and chronic effects of exposure to hazardous substances at the site; <br /> 3. OSHA rights and responsibilities; <br /> 4. Monitoring procedures; <br /> 5. Operating procedures; <br /> 6. Personal Protective Equipment; <br /> 7. Decontamination; and, <br /> 8. Emergency Procedures. <br /> D. All subcontractor personnel involved in the project will be required to complete similar <br /> training and to attend all site-specific safety briefings. <br /> E. Specific training methods will stress the need for personal hygiene and decontamination <br /> procedures, use of the 'Buddy System" and personal protective equipment. <br />