Laserfiche WebLink
e7;17/1534 E1:28 31.13, 7,•5:_;5.0 T'S TE.-;-i aAa= 04 <br /> So7�lceeptance Criteria <br /> TPS Technclosies. Inc. requires all projects or sources of contaminated soil to be profiled <br /> and analyzed br'„re it is accepted at the facilityfor treaunent. Each facility will roeuire a <br /> djfferent profile -:ata, frequcucy of testing, and acceptance criteria depending on the State <br /> and local rc_cl:a;,,n authorities defioidon ofpetroleum contaminated soil and the source <br /> of the co,-.t nirta:iurt. <br /> In general, .ill fi.::lities have a Seii Data and Certification Sheet that must be completed by <br /> the uenerator till ;oil acceptance The data sheet will typically identify the Generator of <br /> the soil the sit-, ;i.ldress, any consultant working on the project that may be representing <br /> the generator, th estimated volume of soil, the laboratory conducting the testing, and <br /> signarures of the t:ecerator and/or environmental 6rra that'represents the generator as an <br /> authorized <br /> Other infonnati,:,u requested on the data sheet will identif/the actual teat requirements for <br /> acceptant:: tc tlic "acibty Sol tering requirements are usually split into rwo (2) <br /> classification: <br /> x T tai;,!: for soils contaminated solely by virgin petroleum products such as <br /> leakin_, mder,round storage tanks; <br /> T z,tin,t for soils with contaminants or'ginating from waste oiL or other non- <br /> vire'r, p--croleum product or virgin product from something other taan a leaking <br /> d storage tank(i.e. a pipeline leak or tank spill). <br /> The generau,r .,ii! ideutif✓the source of the contaminated soil and thereby determine the <br /> exact testme tt l:r., rttents, with the least being a test for total petroleum hydrocarbons <br /> (TPH) and a i st !�. r Benzene, Toluene, Ethylbenzene, and Xy'.ene (BTEX) All testing <br /> must be perthrnr.r its a state ceri5ed laboratory and be less than one (l) year old. <br /> The entire package of analytical data and the data sheet is sent to the facili� for review <br /> and approval t, th; facility manager. Additional testing may be required cn special <br /> projects. Soil resin, requirements and review of analytical data ensure that all soil is non- <br /> h3Zar iggn� bete: a : eptar.ce at the facility, <br /> once approved h she facinry manager, the project will be assigned a job account number <br /> for material tr<ck:ara purposes and tracking manifest(s) will be generated for the project by <br /> the faciity. Iiia nt intortnation regarding the project site is typed onto the manif st and <br /> then sent to th • ii;i,erator'Consultant for signatures. These manifest ate generally sent <br /> out the dapof are o al by either overnight delivery or regular mai. <br /> thAll trucks arriving at <br /> Ole facility rnu•r nrrsent a sigred IT'S Technologies manifest identifying the same <br /> informaticn tn:,i :t> oa the Soil Data Certification sheet along with the selected <br /> transportation orrt:un. <br /> (ycII1Ql pIn <br /> 2 <br />