My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
450
>
2300 - Underground Storage Tank Program
>
PR0231323
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:52:24 PM
Creation date
11/2/2018 5:09:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231323
PE
2381
FACILITY_ID
FA0003792
FACILITY_NAME
U-Haul Moving & Storage of Lodi
STREET_NUMBER
450
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
041-300-12
CURRENT_STATUS
02
SITE_LOCATION
450 N Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\450\PR0231323\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the soil stockpiles were analyzed for Total Petroleum Hydrocarbons(TPH)using Environmental Protection <br /> Agency(EPA)Method 8015(using gasoline and diesel fuel standards),for Benzene,Toluene,Ethylbenzene, <br /> and Xylenes (BTEX) with MTBE distinction using EPA Method 8020, and for Total Lead using EPA <br /> Method 6010. <br /> 3.5 BACKFILLING AND RF. 1RFA IN THE EXCAVATION <br /> On December 18, 19,and 20, 1996,Wayne Perry,Inc.backfilled the tank excavation area with imported fill <br /> material and compacted native soil. A portion of the native soil (soil stockpiled near the excavation)and <br /> imported soil was used to bring the excavations up to within four to six inches of the site grade. Compaction <br /> testing was completed by Kleinfelder,Inc.of Stockton, California. A copy of the compaction test report is <br /> included in Appendix E. <br /> Following the completion of the backfilling and compaction program, Wayne Perry, Inc. resurfaced the <br /> excavation area with asphalt to match the surrounding grade level. It must be noted that approximately 30 <br /> to 50 cubic yards of native soil was left stockpiled on site following the backfilling and resurfacing program. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.