Laserfiche WebLink
*-Apo ., <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (one Than per finality) <br /> lar. <br /> TYPE OF ACTION ❑ LNEW PLAN 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) — <br /> BUSINE NAME(Same as FA9WY NAME) R02 <br /> G S <br /> BUSINESS SITE AD�I�"RESS CITY ' <br /> 70 J AO <br /> II SPIAL COP[7ROL C'L METHODS <br /> This plan addresses unnullroriaod releases from UST system and supplements the emerg lacy respowc plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,ale.)and,if necessary,safely remove <br /> remaining hazardous imterial from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous mmeriol,but not greater than 30 calendar days,or sooner if rcquiladby(lie local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use wi II be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a property labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water lots it petroleum sheen(i.c.,rainbew colors),it is contaminated. A thick Boating petroleum layer play not necessarily display <br /> rainbow colons. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible dGerioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary contaiumentis not compatible with the material used for secondary containment <br /> 2. Secondary containment is prorm to damage from any equipment used to remove or clean up hazardous nmterial collected in secmtdary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary Cornainmen system, is placed inside secondary containment to beet or nemmlize <br /> released product/waste,and the added material or insulting material from such a combination is not compatible with secondary containment. <br /> III SPILL CO1xTROL AND CLEAN_—UP EQUIPMENT µ? <br /> PERIODIC MAINTENANCE: Spillcontroland clean-upequipmentkept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after cacti use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IF NEEDED: (Complete uly ifapplicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIs. R10 <br /> RI1. R31. <br /> RII. All W1 <br /> AUG 91 2013 <br /> RU. M. RA. <br /> RI` ENVIRONMENTAL <br /> RIS. HEALI H DEPAR I mERT-am.— W5. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)1S/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rea. TITLE esu <br /> a A c Ki <br /> NAME / Ml. TITLE Rsm. <br /> R4 I <br /> NAME TITLE — <br /> NAME Res. TITLE <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS- <br /> ❑Additional system testing ordam collection ❑Inspection by qualified parsons ❑Recalibration of equipment <br /> Other. <br /> Jus). <br /> UST Response Plan(3/2008)-1/3 <br />