My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/ SIR EquipVent: Check this box if tank g*eging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co tete the following checklist: a <br /> Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Ef Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> s Ll No* Was accuracy of system product'level readings tested? <br /> s Ll No* Was accuracy of system water level readings tested? <br /> .YeAl Yes ❑ No* Were all probes reinstalled properly? <br /> Ef Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the Ilowin checklist: <br /> Yes Z No* For equipment start-up or annual equipmentceftification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate:.3 3 g.p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> Fs ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 13 No* Was the testing apparatus properly calibrated? <br /> ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O N/A <br /> ❑ Yes ❑ o* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> fel N/A <br /> ❑ Yes ❑ )f'o* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Ur N/A or disconnected? <br /> ❑ Yes ❑ o* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> El N/A or fails a test? <br /> ❑ Ye ❑ o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> }a N/A <br /> Yes 113 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.