Laserfiche WebLink
SWRCB,January 2002 f Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed 13y: Fl Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Sped) <br /> Test Method Used: X Pressure D Vacuum 0 Hydrostatic <br /> 1 Other(Spec) <br /> Tcst Equipment Used--Aix Compressor and 0-15#Dial gauge equipmem Resolution: <br /> Piping Run 487 pro Piping Run#87 vapo piping Run 487 vent Piping Run#91 pro <br /> Piping Material: Poly Fiberglass Fiberglass Poly <br /> Piping Manufacturer: Environ A.O. Smith A.O.Smith Environ <br /> Piping Diameter: 2" 3" 3" 2., <br /> Length of Piping Run: 120' 100' 20' 125' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Test boots at the end Test boots at the ends Test boots at end of Test boots at ends of <br /> i ' -run isolation: of the pie runs of pipe runs PTpe runs piperms <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> startin test: <br /> Test Start Time: 12:00 pm 12:00 pm 12:0017m 1:15 pm <br /> 1ni6al Reading(Rh): 5 psi. 5 psi 5 psi 5 psi <br /> Test End Time: 12:30 pm 12:30 pm 12:30 pm 1:45 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 30 minutes 30 minutes 30 minutes 30 minutes <br /> Change in Reading(R,-Rh): 0 change 0 change 0 change 0 cbarge <br /> Pass/Fail Thresbold or 0 change=pass 0 change=pass 0 change—pass 0 charge=pass <br /> Criteria: <br /> Test Result: I X Pass 0 Fail X Pass 0 Fait X Pass 0 Fail X Pass ❑Fail <br /> COMM ents—(include information on repairs made prior to testing and recommended follaw-up for failed tests) <br />