My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 f Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed 13y: Fl Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Sped) <br /> Test Method Used: X Pressure D Vacuum 0 Hydrostatic <br /> 1 Other(Spec) <br /> Tcst Equipment Used--Aix Compressor and 0-15#Dial gauge equipmem Resolution: <br /> Piping Run 487 pro Piping Run#87 vapo piping Run 487 vent Piping Run#91 pro <br /> Piping Material: Poly Fiberglass Fiberglass Poly <br /> Piping Manufacturer: Environ A.O. Smith A.O.Smith Environ <br /> Piping Diameter: 2" 3" 3" 2., <br /> Length of Piping Run: 120' 100' 20' 125' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Test boots at the end Test boots at the ends Test boots at end of Test boots at ends of <br /> i ' -run isolation: of the pie runs of pipe runs PTpe runs piperms <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> startin test: <br /> Test Start Time: 12:00 pm 12:00 pm 12:0017m 1:15 pm <br /> 1ni6al Reading(Rh): 5 psi. 5 psi 5 psi 5 psi <br /> Test End Time: 12:30 pm 12:30 pm 12:30 pm 1:45 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 30 minutes 30 minutes 30 minutes 30 minutes <br /> Change in Reading(R,-Rh): 0 change 0 change 0 change 0 cbarge <br /> Pass/Fail Thresbold or 0 change=pass 0 change=pass 0 change—pass 0 charge=pass <br /> Criteria: <br /> Test Result: I X Pass 0 Fail X Pass 0 Fait X Pass 0 Fail X Pass ❑Fail <br /> COMM ents—(include information on repairs made prior to testing and recommended follaw-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.