My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:10:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2003 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
10/28/2016 6:58:12 PM
QuestysRecordID
3244411
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SW1ZC13,January 2002 —� ... Pap 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Presstrte C vacuum 0 hydrostatic <br /> 0 Other(Specify) <br /> TerEq,upm ,Used:Air Compressor and 0-15#dial gauge Equipment Resolution: <br /> Piping Ran#91 vent Piping Run# Piping Ron# Piping Run# <br /> PiFiberglass <br /> Piturer. A.O.Smith <br /> Pi : V <br /> Leg Run: 20' <br /> Product Stored: Gasoline <br /> Method and location of Test boats at the end <br /> i ' -run isolation: of the pipe run <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 1:15 pm <br /> Initial Reading(Rt): 5 psi <br /> Test End Time: 1:45 pm <br /> Final Reading(Rv): 5 psi <br /> Test Duration: 30 minutes <br /> Change in Reading(RF-R): 0 Cbange <br /> Pass/Fail Threshold or 0 change=pass <br /> Criteria <br /> Tat Result: X Paas 0 Fail 0 Pass 0 Fail 0 n 0 Fail 0 Pass 0 Bois <br /> Comments—(Imiude information an repairs made pn or to tearing, and recommendedfollow-up for failed rests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.