Laserfiche WebLink
SWRCB,January 2002 v~ Page 7of7 <br /> 9. SMUOVERIML CONTAMN[ENT BOXES <br /> Facility is Not Equipped With 5 ilVOverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket ManufacMer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum XHydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used:Incon TS STS Equipment Resolution: <br /> Spill Box#87 Spill Box#91 Spill Box# Spill Box# <br /> Bucket Diameter. 12" 12" <br /> Bucket Depth: 15" 15" <br /> Wait time between applying <br /> presumt/vacuum/water and 10 Minutes 10 Minutes <br /> starting test: <br /> Test Start Time: 8'55 am 8:55 am <br /> Initial Reading(Rj): 1.4229" 0.3395" <br /> Test End Time: 9:10 am 9:10 am <br /> Final Reading(RF): 1.42541' 0.3608" <br /> Test Duration: 15 Minutes 15 Minutes <br /> Change in Rcading(.RF-R): +.0025" +.0213" <br /> Pass/Fail nreshold or ¢002"=pass <002"-pass <br /> Criteria: <br /> Teat Result: X Page 0 Fall I X Pm Q Y*U 1 ❑ Prig ❑Fall ❑ Pori ❑Fail <br /> Comments—(include irllbrmarion on repaim made prior to teoft and recommended follow-up for failed setts) <br /> Signature of Company Representative Date <br />