Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FORA '•` <br /> UNDERGROUND STORAGE TANK " q�.' <br /> MONITORING PLAN-(Pae 1 of 2) A - - � <br /> 490-1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. AARK f 4 0112490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSFEM(97- _ <br /> I. FACILITY INFORMATION <br /> 1 <br /> FACILITY ID#(Agency Use Only) F A Q -IEA <br /> O� A U Q✓ 2 <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> BUSINESS SITE ADDRESS10. CITY <br /> �lSb • 9 . c�T-Yv Kex. LN <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR '2632,2634,2638 2641 <br /> 4903. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490.3b <br /> IH.MONITORING LOCATIONS <br /> ❑ I.NEW SITE PLOT PLAN/MAP SUBMfITED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49ca <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S); <br /> L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 4"0-5 <br /> VAULTS)W ITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) 49os <br /> SECONDARY CONTAINMENT IS: �,a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACWM <br /> ----- <br /> ------------ _ ---- - - -a9o-a <br /> PANEL MANUFACTURER: --_° ] MODEL#: L� L <br /> MODEL#(S): 490.10 <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTE USED TO MONITOR SINGLE WALL TANK(Sl (23 CCR§2643) 690-11 <br /> 490.12. MODEL#_ 490,0 <br /> PANEL MANUFACTURER_ _--__ _ - <br /> ---- ago-t0-. MODEL#(S): 494i 15 <br /> 1N-TANK PROBE MANUFACTURER: __ -- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS [3b.DAILY/NIGHTLY F c.WEEKLY 490-16 <br /> 490-I] <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> ---- - - 490.18 <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.h. I b.0.2 g.p.h. ❑ c.OTHER(Specify): 490,19 <br /> 490.20 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): <br /> 490.21 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURSesp22 <br /> 5,TANK INTEGRITY TESTING(23 CCR§2643.1): 490,23 <br /> TEST FREQUENCY: RL a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 425 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWINGrMETHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SOMP(S)AND OTHER SECONDARY CONTAINMENT W ITH AUDIBLE AND 490-2s <br /> VISUAL ALARMS. (23 CCR§2636) 490-29 <br /> SECONDARY CONTAINMENT IS:HI&DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM <br /> 490.30 MODEL#: ML 49x31 <br /> PANEL MANUFACTURER: <br /> n,,,,� 49a3z MODEL#(S): 490-33 <br /> LEAK SENSOR MANUFACTURERS _-'-"�___ <br /> 490-34 <br /> PIPING LEAK ALARM TRIGGERS AUIUMAI R;Furvlr it.e.,TURBINE)SHUTDOWN. a.YES ❑b.NO <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑b.NO 49o-3s <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED490.3(23 CCR§2636 )_-_ 490-36 <br /> ----- 490-38 MLLD MANUFACTURER(S): VOPI MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THA T ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> _-_--_ - 490.40. MODEL#(S)S 49041 <br /> ELLD MANUFACTURER(S) __- --- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. a9oaz <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 11a YES Elb.NO 490.43 <br /> ELLD FAILURE/DISCONFIECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. <br /> ❑e.YES ❑b.NO 09044 <br /> IQ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FRE UENCY in a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-464904] <br /> Lj S.VISUAL PIPE MONITORING. 490d8 <br /> FREQUENCY ❑ a DAILY ❑ b.W EEKLY`❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490.49 <br /> •A11mvd for monitoting orwburied ema,,aicy wmtm fuel ejejn8 m[y W HSC 25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. a9aso <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 490.52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12(2007)I/4 <br />