Laserfiche WebLink
�NIFIED PROGRAM CONSOLIDATED FORJ& <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Pa9e2of2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-548 <br /> 490-546 <br /> El LCONTINUOUS ELECTRONIC MONITORING iK 2.FLOAT AND CHAIN ASSEMBLY El3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑99.OTFIER(Species_ <br /> PANEL MANUFACTURER: 49ass MODEL#: 49o-s6. <br /> ------- —'--- -- ------ ------------------- <br /> LEAK SENSOR MANUFACTURER: 49ast MODEL#(S): 490-50. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES g[h.7NN 49x59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a YES b.N 4�60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. YES 490fir <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a YE 49oa2 <br /> 2.UDC CONSTRUCTION IS X L SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: (]1.1,QUID_g 2.PRESSURE [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO <br /> VII. PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> LEAK DETECIIZ D_MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1)__ <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SlPIL L BUCKF,TS ARE TESTED ARMIALLY. 49a67 <br /> VIII. RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490688 ❑Visual Inspection Records 490fi86 N Tank integrity testing results 490fi8c <br /> SIR testing results(and supporting documentation records). 49a68d ❑ Tank gauging results(and supporting documentation records). 499-e8e <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 4%.680 <br /> Equipment maintenance and calibration records. 490­6gh <br /> IX.TRAINING <br /> �]Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490s a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> pwpwpw���III THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-696 <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49a69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 49x698 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49a69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49098 <br /> ❑ OTHER(Specify):m69h,m69i <br /> Pg This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills w specified in the UST Response Plan <br /> D Names of contact persons)for emergencies and monitoring alarms.490-70 <br /> CR-)COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-91 <br /> PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following persons)are responsible for performing the monitoring and equipment maintenance: <br /> NAME 49 72 TITLE 49x73 <br /> NAME 490-74 TITLE 49x95 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNA RE 490.76 DATE: 490.]7 <br /> re ; 3 <br /> APPLICANT NAME(print) 4911 APPLICANT TITLE: 090-79 <br /> Y'0.✓ �- <br /> UPCF UST-D(12/2007)3/4 <br />