Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— e 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Chock au <br /> UDC MONITOR@IG IS PERFORMED USING THE FOLLOWING METHOD(S) that apply) <br /> ® I.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE d9 5- <br /> ❑ 4.NO DISPENSERS �}--❑ 9999.OTHER(Specify) 45a50,. <br /> LEAK MONITOR MANUFACTURER Y asass. MODEL#: 4W%. <br /> LEAK SENSOR MANUFACTURER: 4--< 4F/2 7208`T 4so57. MODEL#(S): 44o5e. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 7i9(I.�Yfj.�wC �a.YES ❑ b.NO 49oss <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 7 W[�a.YES ❑ b.NO 4W59 <br /> FAILURE1DISCONNECDON OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a a YES ❑ b.NO S <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER aa.YES ❑ b.NO 49Q� <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL E.DOUBLE WALL 4 . <br /> IF DOUBLE WALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: B-a.LIQUID ❑ b.PRESSURE ❑ C.VACUUM 4 .4 <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES ❑ b.NO d� <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED —s. <br /> L CTI N(ELD1 MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.ID ccn yzs44.p <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4so es <br /> 0 3.SPILL BUCKETS ARE TESTED ANNUALLY. 4yo sr <br /> VIII. RECORD KEEPING <br /> The following monimring/maintConam records are kept for this facility: 49oaa <br /> ® a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTSand supporting ppGdocumentation records) <br /> [3 f LOS ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® It EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following doct®eMs televam m themjob druies: 4sosa4. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Checkall that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49ob9c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS - 49oru <br /> ❑CALIFORNIA UNDERGROUND STORAGE TANK LAW 41 a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49p69r <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490699 <br /> ❑ OTHER(Specify): 490696. <br /> 49p69i. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 49 " <br /> (ICC). The "Designated UST Operator"will wain facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)ofcontact:personas)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide ad itional comments here or indicate how many pages with additional information on specifi monitoring procedures are attached to this plan. 490.]1_ <br /> '7 0 Ar— �� W 401 <br /> XL PEICNIIJINNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> this plan occurs all conditlons that irdicate a possible release are investigated;and 3. all monitoring records are maintained properly. <br /> THE FOLLOWING PERSONS)ARE RESPONSIBLE FOR PERFORMING THE MONITOREN A D EQUI MAINTENANCE: _- <br /> NAME: S - ^ 4 4wn. TITLE: �� 49 n <br /> NAME. 49at4. TITLE: 49075. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify thatfiteivaqrmation provided herein is true and accurate to the best of My knowledge. <br /> APPLICANT SIGNATURE DATE: 496:n. <br /> REPRESENT : r.Tads ow F®li Owner/ I 3.Auap,imd iomutiveofOvmv 490.]6 'f � 9 . <br /> rl v <br /> APPLIC NAME(prim): {_ 490. ' APPLICANTTITLE: 490-79. <br /> �6L�K PLO,.['s ID�,17 <br /> UPCF UST-D(IM2007)-3/4 wws.aaidots.org <br />