My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 1:13:06 PM
Creation date
11/2/2018 5:38:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
5/25/2016 4:46:31 PM
QuestysRecordID
3092767
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rrNIFIED PROGRAM CONSOLIDATED FOAL <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2 <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2-CHANGE OF INFORMATION �- <br /> PLAN TYPE (J71.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490.z <br /> (Chore k Ms Item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACHX Y ID#(Age WeUse Only) <br /> BUSINFSS AME(Some as Focili Nmne or DBA) y <br /> AJ <br /> BUSINESS Sl fE ADDRESS r03. CITY 3N <br /> t o Cc C-4'�b 54> 12 / 670 N <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the fiequency specified <br /> .by the equrment-manufacturers'inshuctiotz�or annually.whichever is mom fir mm-Such work m rformed.�_gwltBed_ Omrel.Izt ccte yz63z zraa zun,zwtl <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99-OTHER(Specify): ~b, <br /> III. MONITORING LOCATIONS <br /> ❑ "EW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN [$�2-SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED R3 ccn l zwz zm4l <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) " ck°u <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTE2STITFAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[D CCR 1zs3z 20 1 <br /> SECONDARY CONTAINMENT IS:: f ❑ a.DRY W b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 690b <br /> PANEL MANUFACTURER y!i D�-�&/L RsQaa T 497. MODEL M l Lg -3 J�� 49oa. <br /> LEAK SENSOR MANUFACTURER 490.9 MODEL#(S): ?4,434b a90.fo. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).ID cm 12sa31 -49ar 1. <br /> PANEL MANUFACTURER 49o-11 MODEL#: 4W13 <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/NIGHTLY490-16. <br /> ❑ c-WEEKLY <br /> ❑ d.MONTHLY ❑ a OTHER(Specify): 4 IT <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.h- ❑ b 02 gp h ❑ a OTHER(Specify): 4 49 1& <br /> Q 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION ID catyxuatl Oso-zo. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)In c,R 1z64s1 - TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS4 4W21. <br /> Wn <br /> ❑ 5.TANK INTEGRITY TESTING PER(D CCR 12643.11 - - 4WD_ <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ a OTHERS 490.x4. <br /> a90.D. <br /> ❑ 99.OTHER(Specify): <br /> 490-26. <br /> a9an <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "'`c apply)° <br /> 1.CONTINUOUS MONITORING OF PIPE(PIPING SUMP(S)AND OTTTER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49 29. <br /> 14�C3C6R SECONDARY CONTAINMENT IS: a.DRY b.LIQUID FILLED 496-29. <br /> 1 ���5 AAA � n❑� Q ❑ c.PRESSURIZED �d.UNDER VACUUM <br /> PANEL MANUFACTURER �s-a U�G-T 490-30. MODEL#: TG-$ 3 690"11. <br /> LEAK SENSOR MANUFACTURER f_g_o 490-31 MODEL#(S): 8 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(ie,TURBINE)SHUTDOWN. 7q q3p 4;Vr ❑ a.YES ❑ b-NO 49 3,t <br /> FAILURE/DISCONNECT]ON OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 49P35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-34 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.ID ccRim6l <br /> MULD MANUFACT IRER(S): 490-37. MODEL#(S): 490-39. <br /> EjP 3.ELECTRONIC LINE LEAK DETECT`gp!R(ELLD)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS.[23 CCR§21wj 490-39. <br /> Ft t n MANUFACTURER(S}. WADf _' aop� a90'0 MODEL#(S): 9 4B 4100 -029 ( <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a MINIMUM MONTHLY 01 gp.h. ❑ b.MINIMUM ANNUAL 0.1 gp.h. 49 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. [lea.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. { a YES ❑ b.NO 49oa4 <br /> ❑ 4.PIPE INTEGRITY TESTING. 49 5. <br /> TEST FREQUENCY: ❑ a ANNUALLY Q b.EVERY 3 YEARS ❑ c-OTHER(Specify) 09DI9� <br /> ❑ 5.VISUAL PIPE MONITORING. 49o-4s. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C MIN.MONTHLY&EACB TIME SYSTEM OPERATED- 49049 <br /> •Apowad T2pibweofimlwied®vamry_g Mag, ,paeemypmr6C§2528r.s%j(3j_, <br /> [16.SUCTION PIPING MEETS EMAPTION CRnElM.[n ttx lxewl lop 490.50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.719 CONNECTED TO THE TANK SYSTEM. 49051. <br /> ❑ 99.OTHER(Spec" ) 490.52. <br /> 690 53, <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.