Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for ARCO am/pm# 83230 as of December 07, 2017. <br /> Open violations from October 24,2017 inspection <br /> Violation#101 -No permit to operate. <br /> A permit to operate the UST system has not been issued. No person may own or operate an UST unless a permit <br /> for its operation has been issued by the local agency to the owner or operator of the UST system. Immediately <br /> obtain a permit to operate a UST system from the EHD. An"Operating without a Permit" penalty applies. <br /> Violation#121 -Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 10/20/16 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance. This information was required to be submitted within thirty days of receiving the <br /> inspection report. This information has not been received resulting in a non-compliant status for this facility. An <br /> operator that receives an inspection report shall have 30 days to submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. Ensure that a <br /> written response documenting corrective actions taken or proposed is submitted within 30 days of receiving an <br /> inspection report. <br /> Violation#314-Failed to have secondary containment or secondary containment not tight. <br /> The inner sump lids for the 87-octane, 91-octane, and diesel submersible turbine pump(STP)sumps do not have <br /> clamps and sump gaskets are missing from the three fill sumps.Also, holes were drilled into the collars of the <br /> 87-octaine, 91-octane, and diesel fill sumps and lids to install the sump lid clamps. <br /> Secondary containment shall be impervious to the liquid and vapor of the substance contained and constructed to <br /> prevent structural weakening as a result of contact with any hazardous substances released from the primary <br /> containment. Immediately contact a properly licensed,trained, and certified contractor to make repairs to the UST <br /> system under permit and inspection of the EHD. <br /> Open violations from October 20,2016 inspection <br /> Violation#121 -Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last performed on 1012212015 and an amended inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted within <br /> thirty days of receiving the amended inspection report. A Return to Compliance Certification was received at the <br /> Environmental Health Department(EHD)on 11!3115 but violations 317(Secondary containment not tight)and 320 <br /> (Secondary containment not constructed to prevent water intrusion)have not been addressed resulting in a <br /> non-compliant status for this facility. An operator that receives an inspection report shall have 30 days to submit a <br /> written response that includes a statement documenting corrective actions taken or proposing corrective actions <br /> which will be taken. Ensure that a written response documenting corrective actions taken or proposed is submitted <br /> within 30 days of receiving an inspection report. <br /> Violation#314-Failed to have secondary containment or secondary containment not tight. <br /> The spill and vapor container reducer boots and band clamps were missing from the 91-octane fill sump, vapor <br /> opening cap was missing on the diesel fill sump lid. The inner sump lids for the 87-octane, 91-octane, and diesel <br /> submersible turbine pump(STP)sumps do not have latches and sump gaskets are missing from the three fill <br /> sumps. All four of the 87-octane spill and vapor container reducer boots were missing the upper band clamps and <br /> one of the reducer boots was missing the lower band clamp,too. Secondary containment shall be impervious to the <br /> liquid and vapor of the substance contained and constructed to prevent structural weakening as a result of contact <br /> with any hazardous substances released from the primary containment. Immediately contact a properly licensed, <br /> trained, and certified contractor to make repairs to the UST system under permit and inspection of the <br /> Environmental Health Department(EHD). <br /> Holes were drilled into the collars of the 87-octane, 81-octane, and diesel fill sumps and lids to install the sump lid <br /> clamps. Secondary containment shall be impervious to the liquid and vapor of the substance contained and <br /> constructed to prevent structural weakening as a result of contact with any hazardous substances released from the <br /> primary containment. Immediately contact a properly licensed, trained, and certified contractor to make repairs to <br /> the UST system under permit and inspection of the Environmental Health Department(EHD). <br /> Page 1 of 3 <br />