Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for ARCO} am/pm#83230 as of December 07, 2017. <br /> Open violations from October 20,2016 inspection <br /> Violation#316-Secondary containment not constructed to prevent water intrusion(after Jul 2003). <br /> Water was found in the diesel submersible turbine pump(STP)sump, and the diesel, 87-octane and 91-octane fill <br /> sumps. Secondary containment shall be constructed to prevent any water intrusion into the system by precipitation, <br /> infiltration, or surface runoff. The service technician removed approximately 112 cup of liquid from two sides of the <br /> diesel STP sump, approximately one quart of liquid from the diesel and 91-octane fill sumps, and approximately one <br /> gallon of liquid from the 87-fill sump and returned the sensor to its proper location. Immediately contact a properly <br /> licensed,trained, and certified contractor to address the water intrusion into the sump under permit and inspection <br /> of the EHD. <br /> Open violations from October 22,2015 inspection <br /> Violation#314-Secondary containment not tight. <br /> 1)The spill and vapor container shroud boots and band clamps were missing on the 87 and 91 spill containers, <br /> vapor opening cap was missing on the diesel fill sump lid. Secondary containment shall be impervious to the liquid <br /> and vapor of the substance contained and constructed to prevent structural weakening as a result of contact with <br /> any hazardous substances released from the primary containment. Immediately contact a properly licensed, <br /> trained, and certified contractor to make repairs to the UST system under permit and inspection of the EHD. THIS <br /> IS A REPEAT VIOLATION CITED DURING THE 2013 AND 2014 INSPECTIONS. <br /> 2)An accumulation of the interstitial fluid(1-2 cups)was noted at the bottom of the diesel fill sump.The technician <br /> onsite indicated that sump's brine is leaking from the secondary containment', in order to verify the leak, he <br /> immersed a white towel into the accumulated liquid,when removed, the towel took on a bluish tint indicating a leak <br /> in the secondary containment. Secondary containment shall be impervious to the liquid and vapor of the substance <br /> contained and constructed to prevent structural weakening as a result of contact with any hazardous substances <br /> released from the primary containment. Immediately contact a properly licensed, trained, and certified contractor to <br /> make repairs to the UST system under permit and inspection of the EHD. <br /> 3) During the inspection it was noted that holes were drilled in the collar of the 91-octane fill sump and sump lid. <br /> These holes were drilled to install the sump lid clamps. The liquid residue trails(white in color)were noted <br /> originating from the areas where the holes were drilled and bolts were installed. Secondary containment shall be <br /> impervious to the liquid and vapor of the substance contained and constructed to prevent structural weakening as a <br /> result of contact with any hazardous substances released from the primary containment. Immediately contact a <br /> properly licensed, trained, and certified contractor to make repairs to the UST system under permit and inspection of <br /> the EHD. <br /> Violation#316-Secondary containment not constructed to prevent water intrusion. <br /> Water was found in the diesel STP sump(approximately 114 cup), 91-octane STP sump(approximately 1 oz.), <br /> 87-octane STP sump(approximately 1 oz.), 91-octane fill sump(approximately 1/2-cup), 87-octane fill sump <br /> (approximately 1 quart), and UDC 13114(approximately 1 oz). Secondary containment shall be constructed to <br /> prevent any water intrusion into the system by precipitation, infitration,or surface runoff. The service technician <br /> removed all the noted liquid. Immediately contact a properly licensed, trained, and certified contractor to address the <br /> water intrusion into all above sumps under permit and inspection of the EHD. <br /> Open violations from October 29,2014 inspection <br /> Violation#314-Secondary containment not tight. <br /> The spill container shroud boots(on all USTs)were either cut or were missing metal clamps to hold shroud boots in. <br /> place.This is a repeat violation which was sighted on the October 28, 2013 inspection report. Secondary <br /> containment shall be impervious to the liquid and vapor of the substance contained and constructed to prevent <br /> structural weakening as a result of contact with any hazardous substances released from the primary containment. <br /> The permit for these repairs(SR0070287)was obtained from the EHD, immediately contact a properly licensed, <br /> trained, and certified contractor and make repairs to the UST system.This is a repeat violation, Class II. <br /> Page 2 of 3 <br />