Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Pae 2 of 2) <br /> (Chekall <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING thata p ly) <br /> hala <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODS) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a <br /> ❑ 4.NO DISPENSERS _ _ 099.OTHER(Specify) —i" <br /> LEAK MONITOR MANUFACTURER:Veeder-Root t96-52 MODEL#:TLS-350 49056. <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 190.57. MODEL#(S):208 490-58' <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-61' <br /> _ UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a_YES ❑ b.NO 490-62 <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-6J. <br /> IF DOUBLE WALL: 490�64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 4sa 64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ L ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.Iv CCR32W.11 <br /> ® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> ® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 49067. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-66. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ a TANK INTEGRITY TESTING RESULTS <br /> ❑ <br /> it.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ E ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> 490-69a <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY': (Check all that apply) 490-69b. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49046 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69r <br /> 490-69g. <br /> OTHER(S t . <br /> ElPco fY): 490-6m49069L <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code 49070. <br /> Council(ICC). The "Designated UST Operator"will train facilityemployees in the proper operation and maintenance of the UST systems annually,and <br /> within 30 days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overt-ills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 49047L <br /> UST TURBINE(STP),FILL&UDC SUMPS MONITORED BY VEEDER ROOT SENSORS 208.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO <br /> MONITOR DOUBLE WALL TANK(S)WITH IN-TANK Veeder-Root MAG PROBE.OVERFILL PREVENTION METHOD:External Alarm set at 90%.EVR ISD <br /> Software Installed. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this Plan occurs;2_)all conditions the indicate a2oossible release are investigated;and 3)all monitoring records are maintained ero�er __ _ ___________ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Patty 4W-12 TITLE: Manager 490-73. <br /> NAME: Maria 4%-74 TITLE: Asst Manager 490-95, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need fallow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best otmy knowledge. <br /> APPLICANT SIGNATURE DATE: 49047. <br /> ate, 02/1112011 <br /> REPRESEMMG:®t.TWr Pamal ar O 2.Facitil Oviar/ ror❑J.AutMr¢d Represenmdve ofgwner 490-]6. <br /> APPLICANT NAME(print): 490-M APPLICANT TITLE: 49049, <br /> Chevron Products Co./Charles Bittle Chevron Retail HES Permit Desk <br /> fArenry nee only) TLlr form bee revkwM and: AN ,d Appmvedxnh Cnn ti Dtvpp M <br /> LJ <br /> Last As.,,Massie.. h° I�J.a �I Dau: ZT <br /> coo,�..e.r sp.da uomn.o.. !��'' <br />