Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 (One form per facility) <br /> Rel <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3, <br /> Chevron Station#210997 <br /> BUSINESS SITE ADDRESS 103 BUSINESS SITE CH'Y IM. <br /> 1442 A Colon Drive Rip <br /> i on CA 95366 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> If safe to do so,facility personnel will take immediate measures toinitial or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwi removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> H Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 Finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed Firl secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be mrnaed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-baza dous. If the water has a petrol m sheen(i.e.,rainbow colors),it is contaminated. A thick Boating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> Y We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in thprimary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting mat;al from such a combination is not compatible with secondary containment. <br /> HL SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipmen kept permanently on-site is listed in the facility's Hazardous Materials Business Plan, This <br /> equipment is inspected at least monthly,and after each use,supplies are)'eplenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Conwwlete osly if a linable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIG. no. Mo. <br /> RIL RZI. mi. <br /> R12. R22, 132. <br /> R13. R21 RA. <br /> R14. R'_4. M4. <br /> RIS. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR A U I 110RIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE no. <br /> NAME <br /> Chevron Emergency Info Center CEIC 800-231-0623 <br /> R41. TITLE R51. <br /> Chevron Maintenance Dispatch Help Desk 866-845-4254 <br /> NAME R4 TITLE R51. <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS 03. RECALIBRATION OF EQUIPMENT Wo. <br /> (9 99. OTHER(Specify):The affected UST System will be shut down foria third party precision test(s)to verify and isolate if a release has occurred. RGI. <br /> UN-0228-819 www.unidocs.org Rev.04/02/08 <br />