My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> } <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: a Tank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specif}) <br /> Test Method Used: I i Pressure ❑Vacuum ❑hydrostatic <br /> ED] (5pec��) <br /> Test Equipment Used: Equipment Resolution: <br /> _ <br /> gUgl Tank#Diesel Tank# — Tank# _ Tank#L <br /> Is Tank Exempt From Testing?' X Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity 10000 <br /> Tank Material: Fiberglass <br /> Tank Manufacturer: Xerxics <br /> Product Stored: Diesel <br /> Wait time beflveen applying <br /> pressure/vacuum/water and 20 nun <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: i <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Readiaig(RF--.lt): <br /> Pass/Fail Threshold or Criteria: <br /> I <br /> Test Residt: ❑ Pass ❑Fail a Pass ❑Fail ❑ Pass ❑Fall ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes D No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA CI Yes ❑No [INA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> COMMentS—(utchide in otmatton on repairs t)tade prior•to testing,and recotiIr»ended fallow-t! fo1'failed tests) <br /> The UST annular is a brine filled systelat Mitch is not required for testing. <br /> j <br /> i <br /> 9 <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary i <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic contaiument <br /> testing. {Caiifornia Code of Regulations,Title 23,Section 2637(a)(6)} <br />
The URL can be used to link to this page
Your browser does not support the video tag.