Laserfiche WebLink
SWRCB,7anuary2002 <br /> Page of <br /> N 5. SECONDARY PIPE TESTING <br /> Test Method Developed By; <br /> 0 piping Manufacturer X Indust Standard <br /> Industry ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used; X Pressure C Vacuum <br /> Cl Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressurized air and Gauges <br /> Equipment Resolution: O loss <br /> Supply UST Return UST Supply/Return AS'1 - -- <br /> Piping Material: T Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3"over2" 3"over2" 31,over2"' <br /> Length of Piping Run: 70, 70' 60, <br /> Product Stored: Diesel Diese! Diesel <br /> Method and location of <br /> piping-run isolation: Test boots Test boots Test boots <br /> Wait time between applying <br /> pressurelvacuumhvater and 20 min 20 min 20 min <br /> starting test: <br /> Test Start Time: 10:30 10:30 11:50 - <br /> Initial Reading(Rt): 5 psi 5 psi 5 psi <br /> Test End Time: 11:30 11:30 12:50 _ <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: I hr I hr 1 hr <br /> Change in Reading(Rr-Rt}: 0 change 0 change 0 change <br /> Pass/Pail Threshold or <br /> Criteria: O loss O loss O loss <br /> Test Results X Pass ❑Fail X Pass 0 Rail X Pass ❑IFiI ❑ Pass i t Fail <br /> ---- <br /> COd231]lentS—(inchirle!ia orrrtcrtiora ort re airs tnad'e prion to testing,and recornintended follo�r-arp or riled tests) # <br /> 6 <br /> i <br /> f <br />