My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 6:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2010 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,7anuary2002 <br /> Page of <br /> N 5. SECONDARY PIPE TESTING <br /> Test Method Developed By; <br /> 0 piping Manufacturer X Indust Standard <br /> Industry ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used; X Pressure C Vacuum <br /> Cl Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressurized air and Gauges <br /> Equipment Resolution: O loss <br /> Supply UST Return UST Supply/Return AS'1 - -- <br /> Piping Material: T Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3"over2" 3"over2" 31,over2"' <br /> Length of Piping Run: 70, 70' 60, <br /> Product Stored: Diesel Diese! Diesel <br /> Method and location of <br /> piping-run isolation: Test boots Test boots Test boots <br /> Wait time between applying <br /> pressurelvacuumhvater and 20 min 20 min 20 min <br /> starting test: <br /> Test Start Time: 10:30 10:30 11:50 - <br /> Initial Reading(Rt): 5 psi 5 psi 5 psi <br /> Test End Time: 11:30 11:30 12:50 _ <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: I hr I hr 1 hr <br /> Change in Reading(Rr-Rt}: 0 change 0 change 0 change <br /> Pass/Pail Threshold or <br /> Criteria: O loss O loss O loss <br /> Test Results X Pass ❑Fail X Pass 0 Rail X Pass ❑IFiI ❑ Pass i t Fail <br /> ---- <br /> COd231]lentS—(inchirle!ia orrrtcrtiora ort re airs tnad'e prion to testing,and recornintended follo�r-arp or riled tests) # <br /> 6 <br /> i <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.