Laserfiche WebLink
SWRCB,January 2002 <br /> Page Of <br /> 6. P[PING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer X Indust Standard <br /> Industry J Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:INCON Equipment Resolution:+-0.002 <br /> " GST piping Sump AST piping Sump Sump 1 Sump# <br /> Sump Diameter; 42" 36„ <br /> Sump Depth: 52" 36„ <br /> Sump Material: Fiberglass Poly — <br /> Height from Tank Top to Top of - <br /> IIi hest Pi in Penetration: <br /> 20" 12+1 <br /> Height from Tank Top to Lowest — <br /> Electrical Penetration: 2051 2859 — <br /> Condition of sump prior to testing: good goad <br /> Portion of Sump Tested' 2"over pipe pen 2"over pipe pen <br /> Does h�rbirte shut down when - <br /> sump sensor detects liquid(bath ❑Yes ❑No X NA (j Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes D No ❑NA <br /> roduct and Nvater)?' <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail-safe <br /> shutdown?' ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?. ❑Yes ❑No X NA ❑Yes 11 No X NA O Yes ❑No D NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 min 30 min <br /> test: <br /> Test Start Time: 11:25/11:42 1:0111:18 <br /> Initial Reading(R): 14.1033/4.1030 4,015$f 4.0155 <br /> Test find Time: I1:40/11:57 1:16/1:33 I <br /> Final Reading(RF.); — f 4.1030/4.1029 4.0155/4.0153 <br /> Test Duration: 15 n11nX2 15 min X 2 <br /> Change:n Reading(RF-Rj): 0.0003 10.0001 0.0003/0.0002 <br /> Pass/Fail Threshold or Criteria: +-0.002 +-0.002 <br /> Test Result: X Pass 0 Fall X Pass ❑Fail ❑ Pass ❑Fall ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Ycs ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No DNA f <br /> f Was sensor properly replaced and <br /> verified functional after testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> COIn"Iellts—(inchide infoi7)iattoii ori repairs made prim-to testing, and recommended follow-rip forfailed tesls) <br /> i <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to quy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must he tested, (See SWRCB LG-160) <br />