My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 1990 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/2/2018 6:12:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2004
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 1990 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES AND SCOPE OF WORK <br /> A . GENERAL INFORMATION: <br /> 1 . Provide all labor , materials and equipment to <br /> furnish a complete and operating fuel dispensing and <br /> monitoring system as indicated on the drawings , <br /> plans and specifications included herein . <br /> 2 . All references to codes , specifications and <br /> standards referred to in the drawings , <br /> specifications and addenda shall mean , and are <br /> intended to be , the latest edition , amendment or <br /> revision of such reference standard in effect as of <br /> the date of these documents . <br /> 3 . Furnish all permits , fees , licenses and bonds <br /> incidental to the completion of the construction as <br /> shown on the plans , specifications and addenda . <br /> 4 . Be responsible for properly laying out the work <br /> executed under the plans and specifications . <br /> 5 . Remove debris as the work progresses . Maintain the <br /> premises in a neat and clean condition and properly <br /> dispose of all construction related debris . <br /> B . GENERAL SCOPE OF WORK: <br /> 1 . Where the tank is to be retrofited , excavate to the <br /> top of the existing tank , cap the F .O .S . , F .O .R . <br /> and vent lines at the tank and petrotite the tank <br /> only . Report the findings to the ATEC <br /> representative . <br /> 2 . Install new 2 " fiberglass vent lines and <br /> galvanized riser ( slope line to tank ) . <br /> 3 . Furnish and install new 2 " primary fiberglass <br /> fuel oil suction and return lines with 3" fiberglass <br /> secondary containment ( slope all lines to tank ) . All <br /> product and vent lines are to be soaped tested with <br /> 50# of air for a period not to exceed 60 minutes . <br /> This test shall be performed in the presence of the <br /> US Sprint representative and the local governing <br /> official . <br /> 4 . Furnish and install a new Owens-Corning model <br /> #sps 42-22a piping sump on the existing tank . <br /> 5 . Furnish and install a new 4" fiberglass fill riser <br /> with O .P .W . #1 spill containment manhole with drain , <br /> O .P .W .-61-SO overfill protection valve , O .P .W . 633T <br /> duratuff fillpipe adaptor and O .P .W . 634TT duratuff <br />
The URL can be used to link to this page
Your browser does not support the video tag.