My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 1990 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/2/2018 6:12:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2004
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 1990 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
top seal cap . <br /> 6 . Furnish and install a new 4 " fiberglass riser with <br /> cap assembly and 18" manhole for the interstitial <br /> sensor in the annular space of the tank . <br /> 7 . Furnish and install a Oilbarco TM-4 with 3 foot <br /> leak sensor in the piping sump and an interstitial <br /> sensor in the annular space at the existing <br /> underground tank as specified in the attached <br /> Exhibit A ( site data sheets ) . Install the TM-4 next <br /> to the existing tank monitor . All underground <br /> electrical work to conform to all applicable local , <br /> state , and federal codes . <br /> 8 . Furnish and install an ALC-20 strobe light and <br /> sound warning system , at the building wall closest <br /> to the tank , per specifications . <br /> 9 . After installation of all piping and related <br /> equipment as described above and in the attached <br /> specifications , after backfilling to sub--grade and <br /> in the presence of the US SPRINT representative and <br /> local governing official , petrotite the tank , <br /> fittings and all underground piping . Upon completion <br /> of the test report the findings to the ATEC <br /> representative . <br /> 10 . Finish backfilling the tank hole with approved <br /> granular material and repair or refinish all areas <br /> affected during construction to the condition of the <br /> adjoining surfaces in a manner suitable to good <br /> workmanship like practices . See the attached details <br /> for concrete specifications . <br /> 11 . properly dispose of all construction related debris <br /> and broom clean the site . <br />
The URL can be used to link to this page
Your browser does not support the video tag.