Laserfiche WebLink
Part II Continued <br />2.02 Appurtenances and Accessories <br />A. Optional anchor straps—Provide FRP anchor straps as <br />supplied by tank manufacturer, Number and location of <br />straps shall be specified in current literature by tank <br />manufacturer. Each strap shall be capable of withstanding <br />the buoyancy load for tank diameter as shown. <br />4 dia.— 4,200 lbs. 8 dia.-25,000 lbs. <br />6 dia.-18,000 lbs. 10 dia.-25,000 lbs. <br />B. Manways <br />1. All manways to be flanged and 22" I.D. complete with <br />U.L, listed gaskets, bolts and covers. (30" and 36" I.D. <br />manways are also available on certain larger size tanks <br />and are optional.) <br />2. Location as shown on drawings. <br />3. Optional manway extension tubes shall be FRP and 24" <br />long. Longer extensions are available in one foot <br />increments. <br />4. Each steel manway cover shall have three 4" NPT fittings <br />welded in place on tanks 3,000 gallons and larger. {Four <br />4" NPT fittings on manway covers of 550, 1,000 and <br />2,500 gallon tanks.) <br />C. Optional Fill Tubes <br />1. Fill tubes shall be FRP or contractor supplied aluminum <br />and installed. Locations as shown on drawings. <br />2. FRP tubes shall be 4" diameter with a 6" x 4" double <br />tapped reducer bushing and include a 6" NPT fitting on <br />the tank. FRP tubes can be installed in manway cover or <br />tank shell wall. Aluminum tubes (contractor supplied) <br />shall be 4" diameter and fit directly into a W NPT fitting. <br />Tubes shall terminate a minimum of 4" from bottom of <br />tank. <br />O. Gauge Plates—Shall be installed under each service fitting <br />and manway opening. <br />E. Heating Coils <br />1. Optional heating coils shall be installed in a separate 22" <br />manway and shall be the standard item supplied by tank <br />manufacturer. <br />2. Location as shown on drawings. <br />F. Optional Ladders—Shall be the standard ladder as <br />supplied by tank manufacturer {aluminum, carbon steel or <br />fiberglass). <br />G. NPT Threaded Fittings <br />1. All threaded fittings shall be a material of construction <br />consistent with the requirements of the U.L. label. <br />2. All standard thread fittings shall be half couplings and <br />shall be 4" in diameter. Reducers are to be used for <br />smaller sizes where shown and provided by contractor. <br />3. Sizes Standard Other Sizes <br />Fill 4" <br />Gauge 4" <br />Inlet 4" <br />Outlet 4'' <br />Vent 4" <br />Extra 4" <br />4. Strength — NPT fittings shall withstand a minimum of 150 <br />ft. pounds torque and 1,000 ft, pounds of bending, both <br />with a 2:1 safety factor. <br />H. Monitor Fittings <br />1. Each monitor fitting shall consist of a 4" NPT fitting on <br />the secondary tank. <br />2. Tanks with a capacity of 3,000 gallons or greater shall <br />have two monitor fittings, one near each end of the tank. <br />Tanks less than 3,000 gallon capacity shall have one <br />monitor fitting. <br />Part 111 Execution <br />3.01, 3.02 Installation and Testing <br />Tanks shall be tested and installed according to current <br />Double Wall Installation instructions provided with the tank. <br />(Refer to current publication and include as part of <br />specification.) <br />Part IV Warranty <br />4.01 Warranty shall be manufacturer's standard warranty. <br />Warranty <br />Petroleum or Alcohol Fuels Storage Double Wall Underground Petroleum <br />Storage Tank With Resin Specified For Expanded Fuels <br />Xerxes Corporation warrants that Xerxes underground storage tanks, if used <br />in accordance with its specifications, are U.L. listed, and installed according <br />to Xerxes published installation instructions: <br />(1) Will not fail for a period of thirty (30) years from date of original <br />purchase due to external corrosion, <br />(2) Will not fail for a period of thirty 5301 years from date of original <br />purchase due to internal corrosion, provided the tank is used solely with <br />or without tank water bottoms for the following products: <br />a. Gasoline; gasohol (90% gasoline/10% ethanol mixture); 90.5% <br />gasoline and 9.5% Oxinol-50* (4.75% methanol and 4.75% GTBA <br />mixture); Dupont EPA waiver (gasoline with 5% methanol and a <br />minimum of 2.5% cosolvent - the blend may contain a maximum <br />concentration of up to 3.7 weight percent oxygen in the final fuel); <br />MTBE (methyl tertiary butyl ether) - gasoline with up to 20%, by <br />volume, of MTBE; gasoline/water/ethanol or methanol blend motor <br />fuels including 100% ethanol or methanol or M85 (85% methanol) at <br />ambient temperatures; jet fuel; av-gas; kerosene; diesel fuel; new or <br />used motor o?; or used for fuel oil at temperatures not to <br />exceed 150°F <br />b. Potable water at ambient temperatures. <br />(3) Will not fail for a period of thirty (30) years from date of original <br />purchase due to structural failure (defined as breaking or collapse) <br />provided the installation is performed and validated by a qualified <br />installation contractor, installed in the United States, and the tank is used <br />as stated above. <br />(41 Will meet. Xerxes published specifications and will be free from material <br />defects in materials and workmanship for a period of one (1) year <br />following date of original delivery by Xerxes. <br />If any tank(s) is to be removed from an installation, moved to original <br />owners new location and is intended for active service at the new location, <br />the lank(s) must be recertified by Xerxes in order to maintain the warranty <br />as originally extended. <br />Xerxes' liability under this warranty shall be limited to, at Xerxes' option, (a) <br />repair of the defective tank, (bl delivery of a replacement tank to the point <br />of original delivery, or ic) refund of the original purchase price. A claimant <br />must give Xerxes the opportunity to observe and inspect the tank prior to <br />removal from the ground or the claim will be barred. All claims must be <br />made in writing within one year after tank failure or be forever barred. THE <br />FOREGOING WARRANTY CONSTITUTES XERXES EXCLUSIVE <br />OBLIGATION AND XERXES MAKES NO WARRANTY OR <br />REPRESENTATION, EXPRESS OR IMPLIED, WITH RESPECT TO THE <br />TANK OR ANY SERVICE, ADVICE, OR CONSULTATION, iF ANY, <br />FURNISHED TO CUSTOMER BY XERXES OR ITS REPRESENTATIVES, <br />WHETHER AS TO MERCHANTABILITY, FITNESS FOR A PARTICULAR <br />PURPOSE, OR OTHERWISE. THE REMEDIES SET FORTH IN THE ABOVE <br />WARRANTY ARE THE ONLY REMEDIES AVAILABLE TO ANY PERSON <br />FOR BREACH OF THE WARRANTY OR FOR BREACH OF ANY OTHER <br />COVENANT, DUTY, OR OBLIGATION ON THE PART OF XERXES <br />HEREUNDER. XERXES SHALL HAVE NO LIABILITY FOR INCIDENTAL, <br />CONSEQUENTIAL OR PUNITIVE DAMAGES OF ANY DESCRIPTION, <br />WHETHER ANY SUCH CLAIM BE BASED UPON WARRANTY, <br />CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER TORT OR <br />OTHERWISE. <br />*TM Arco Chemical Co. Effective 1011/91 <br />14 <br />XERXES' <br />CORPORATION <br />