Laserfiche WebLink
� ISPEAFICATION <br />XERXES" DVT 11 <br />Guide Specification For Hydrostatic Monitoring <br />of FRP Underground Storage Tanks <br />Part 1 General <br />1.0 The tank manufacturer shall supply a continuously monitored <br />hydrostatic head pressure leak detection system. The system <br />shall be designed by the manufacturer to detect a leak in <br />either the primary tank or the secondary tank in either a wet <br />or dry excavation. The system shall include: a brine solution <br />(to prevent freezing) delivered to the job site in the interstice <br />of the double wall tank; a reservoir mounted on top of the <br />tank to provide a liquid medium for monitoring; and an <br />electronic monitoring system to sound an audible and visual <br />alarm when the liquid level of the reservoir rises or falls to <br />predetermined alarm points. The system shall also include an <br />electronic sensing probe to monitor the attached manway <br />riser for the submersible pump, if so specified. <br />Part II Standards <br />2.0 The double wall tank with a brine filled interstice shall be <br />listed by Underwriters Laboratories (U.L.). The electronic <br />monitoring system used to monitor the liquid reservoir and <br />the attached manway riser shall also be listed by (U.L.) for <br />intrinsic safety in a hazardous location. <br />All equipment shall be installed in accordance with the <br />manufacturer's instructions and all applicable federal, state, <br />and local laws and regulations. <br />Part III Requirements <br />for Liquid Filled Double Wall Tank <br />3.0 The interstice of the double wall tank shall be filled with a <br />brine solution. The tank shall be delivered to the site with the <br />brine solution in the interstice for all tanks up through 20,000 <br />gallons. Brine filling of interstice on 25,000 and 30,000 gallon <br />tanks shall be done at job site by contractor. The reservoir <br />shall be constructed of fiberglass and mounted directly to the <br />top of the tank. The reservoir shall be fitted with one 4" NPT <br />fitting suitable for installation of the electronic reservoir <br />probe. The reservoir shall have a capacity of 14 gallons for <br />tank sizes 550 through 20,000 gallons, and 40 gallons for the <br />25,000 and 30,000. <br />Part IV Requirements <br />for the Electronic Monitoring System <br />4.0 The Controller <br />The panel shall receive the signal from the reservoir andlor <br />attached manway riser and provide for the following <br />indications: <br />1. System.normal <br />2. System fault {the "fault" indication must not be the same <br />as the "alarm" indication) <br />3. System leak alarm <br />Also a system test switch indicating the system is functional <br />shall be provided. <br />All alarms shall be both audible and visible. <br />Unit shall be able to be reset. <br />The control panel shall provide indication of which tank is in <br />the alarm condition, if more than one tank is being monitored. <br />The control panel shall be capable of monitoring up to eight <br />probe points. <br />The system shall provide intrinsic safety at the probe locations. <br />4.1 Reservoir Probe <br />The probe shall be constructed of a material which is suitable <br />for prolonged, complete immersion in the monitoring liquid. <br />The monitoring liquid may be: <br />Salt Brine (up to 30% CaCI in water). <br />Hydrostatic Monitoring <br />For FRP Double Wall Tanks <br />The probe shall detect and report a change in liquid level <br />either above (high alarm point) or below (low alarm point) the <br />neutral level established during the initial filling and <br />subsequent maintenance of the system. The probe shall not <br />operate by inducing an electrical current into the liquid <br />medium which is being monitored. <br />The sensing range represents a built-in allowance for <br />pressure and thermal variation. Until the liquid level exceeds <br />the allowable variation, the probe shall not send a signalto <br />the monitor unit. <br />The probe shall be capable of being mounted in the reservoir <br />in a manner which allows adjustment of location. The probe <br />must be able to be mounted so that normal fluctuations of <br />the liquid level do not interfere with the normal operation of <br />the probe. <br />The probe shall be capable of operating at a distance of 500 <br />feet from the control panel. <br />4.2 Attached Manway Riser Probe <br />(if applicable and shown on the drawing) <br />The probe shall be constructed of a material which is suitable <br />for prolonged, complete immersion in any of the fluids listed <br />in U.L. Standard for Safety 1316, Table 14.1, all columns. <br />The probe shall detect the presence of liquid in the riser when <br />the liquid level has risen to a maximum of one inch above the <br />bottom of the probe as located in its permanent mounting <br />position. The permanent mounting position is determined by <br />the installer at the time of installation. <br />The probe shall be capable of being mounted in the riser in a <br />manner which allows adjustment of location. The probe shall <br />be able to be mounted so that an increase in the liquid level <br />does not interfere with the normal operation of the probe. <br />The probe mounting assembly supplied and installed by <br />contractors shall provide protection for the probe from the <br />operational activities which may take place within the riser. <br />The probe shall be capable of operating at a distance of 500 <br />feet from the control panel. <br />4.3 Operating Parameters: <br />Temperature: Voltage; <br />0Eto150F. 110 or 220 VAC, 50160 Hz <br />Part V Performance <br />5.0 The continuous hydrostatic monitoring system, including the <br />electronics and the probes, shall be capable of detecting and <br />alarming when the liquid level in the tank reservoir rises or <br />drops 3" to activate the sensing probe. <br />Part VI Materials <br />6.0 The materials used in the monitoring system shall be <br />corrosion resistant to the liquid used to fill the interstice and <br />the liquid used to.fill the interstice shall not be corrosive to <br />the materials of construction of the fiberglass tank. <br />Part VII Installation <br />7.0 The monitoring systems shall be installed in accordance with <br />the manufacturer's installation instructions and all applicable <br />federal, state and local laws and regulations. <br />