Laserfiche WebLink
0 0 <br /> SWRCB,January 2002 Page I of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer r Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: rv-1 Pressure r Vacuum r Hydrostatic <br /> r Other(Spec) <br /> Test Equipment Used: gnLe Equipment Resolution: .20 <br /> (Tank 1-pul) (funk 2-rut) <br /> STP Containment 1 to 1/2 .STP Containment I to lit <br /> Piping Material: dwFlex dwflex <br /> Piping Manufacturer: environ environ <br /> Piping Diameter: 2 in. 2 in. in. in. <br /> Length of Piping Run: 20 ft. 20 H. ft. ft. <br /> Product Stored: PUL RUL <br /> Method and location of <br /> i in -run isolation: sump sump <br /> Wait time between applying <br /> pressure/vacuum water and 5 min 5 min min min <br /> stunting test: <br /> Test Start Time: 10:20:00 10:20:00 <br /> Initial Reading(RI): 5.00000 PSI 5.00000 PSI <br /> Test End Time: 11:20:00 11:20:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI <br /> Test Duration: I hr I hr <br /> Change in Reading(RF-Rt): 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/- +/- <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br />