Laserfiche WebLink
MONIT%31NG SYSTEM CERTHWATION <br /> CERTIFICATION 1 TEST DATE: January 8, 2009 <br /> Al. FACILITY A2. OWNER <br /> Name 7-Eleven Market#2368 I Store#14117 Name 7-Eleven, Inc <br /> Address 2725 Country Club Lane,Stockton,CA 95201 Address P.O. Box 711, Dallas,TX 75221 <br /> Phone# 209-463-1259 Phone# 805-523-2945 <br /> Contact Jay Stemley Contact Shane Partridge <br /> F. IN-TANK GAUGING I SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SITZ equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rates ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> ❑ NIA <br /> FEIYe ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> El Yes El No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or falls a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> This is a MSC modification test after ISD installation and cold start. <br /> C)2006 Walton Engineering,Inc. <br /> Page 3of3 <br />